hanyu gu
hanyu gu
Verified email at uts.edu.au - Homepage
Title
Cited by
Cited by
Year
Robust and stable scheduling of a single machine with random machine breakdowns
L Liu, H Gu, Y Xi
The International Journal of Advanced Manufacturing Technology 31 (7), 645-654, 2007
912007
Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck*
Z Yan, G Hanyu, X Yugeng
Journal of Systems Engineering and Electronics 18 (3), 556-565, 2007
292007
Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem
B Wang, Y Xi, H Gu
Computers & operations research 32 (11), 3059-3072, 2005
202005
A rolling window optimization method for large-scale WCDMA base stations planning problem
HY Zhang, YG Xi, HY Gu
European journal of operational research 183 (1), 370-383, 2007
182007
Rescheduling Algorithm Based on Rolling Horizon Decomposition for a Dynamic Job Shop with Uncertain Arriving Time [J]
L Yugeng
Chinese Journal of Mechanical Engineering 5, 2008
17*2008
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
D Thiruvady, M Wallace, H Gu, A Schutt
Journal of heuristics 20 (6), 643-676, 2014
162014
Feasibility analysis and soft constraints adjustment of CMMO
Y Xi, H Gu
Acta Automatica Sinica 24, 727-732, 1998
161998
Bottleneck-based decomposition algorithm for large-scale flow shop scheduling problems
Y Zuo, H Gu, Y Xi
Control and Decision 21 (4), 425, 2006
152006
A new algorithm for the computation of low frequency electro-mechanical oscillation modes of large power systems
G Han-yu, C Chen
PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 20 (9), 50-54, 2000
142000
Feasibility analysis and soft constraints adjustment of CMMO
X Yugeng, G Hanyu
Acta Automatica Sinica 24 (6), 727-732, 1998
141998
A Lagrangian relaxation based forward-backward improvement heuristic for maximising the net present value of resource-constrained projects
H Gu, A Schutt, PJ Stuckey
International Conference on Integration of Constraint Programming …, 2013
112013
Feasibility analysis of constrained multi-objective multi degree of freedom optimization control in industrial processes
X Yugeng, L Kang
Control Theory & Applications 12 (5), 590-596, 1995
111995
Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements
H Gu, A Kononov, J Memar, Y Zinder
Journal of Discrete Algorithms 52, 143-155, 2018
102018
Decomposition and coordination scheduling method for flow-shop problem based on TOC
HY Zhang, YG Xi, HY Gu
Acta Automatica Sinica 31 (2), 182-187, 2005
102005
Quick taboo search algorithm for solving PDPTW problem
Y Jia, H Gu, Y Xi
Control and Decision 19 (1), 57-60, 2004
92004
Lagrangian relaxation versus genetic algorithm based metaheuristic for a large partitioning problem
OG Czibula, H Gu, Y Zinder
Theoretical Computer Science 718, 24-36, 2018
82018
Exact and heuristic methods for the resource-constrained net present value problem
H Gu, A Schutt, PJ Stuckey, MG Wallace, G Chu
Handbook on project management and scheduling vol. 1, 299-318, 2015
82015
Improved scheduling strategy for batching tools in semiconductor wafer fabrication
X Wang, H Gu
COMPUTER INTEGRATED MANUFACTURING SYSTEMS-BEIJING- 13 (6), 1115, 2007
82007
A Multi-Stage IP-Based Heuristic for Class Timetabling and Trainer Rostering
O Czibula, H Gu, A Russell, Y Zinder
72014
Maximising the net present value of large resource-constrained projects
H Gu, PJ Stuckey, MG Wallace
International Conference on Principles and Practice of Constraint …, 2012
72012
The system can't perform the operation now. Try again later.
Articles 1–20