Follow
Issam Srour, Ph.D.
Title
Cited by
Cited by
Year
Accessibility indices: Connection to residential land prices and location choices
IM Srour, KM Kockelman, TP Dunn
Transportation Research Record 1805 (1), 25-34, 2002
1922002
Engineering students’ perceptions of soft skills, industry expectations, and career aspirations
M Itani, I Srour
Journal of professional issues in engineering education and practice 142 (1 …, 2016
1842016
Using BIM to retrofit existing buildings
M Khaddaj, I Srour
Procedia Engineering 145, 1526-1533, 2016
1472016
Behavioral determinants towards enhancing construction waste management: A Bayesian Network analysis
A Bakshan, I Srour, G Chehab, M El-Fadel, J Karaziwan
Resources, Conservation and Recycling 117, 274-284, 2017
1162017
A field based methodology for estimating waste generation rates at various stages of construction projects
A Bakshan, I Srour, G Chehab, M El-Fadel
Resources, Conservation and Recycling 100, 70-80, 2015
1152015
A methodology for scheduling overlapped design activities based on dependency information
IM Srour, MAU Abdul-Malak, AA Yassine, M Ramadan
Automation in Construction 29, 1-11, 2013
812013
Development of an urban accessibility index: formulations, aggregation, and application
C Bhat, S Handy, K Kockelman, H Mahmassani, A Gopal, I Srour, ...
Work 4938 (4), 2002
802002
Linear programming approach to optimize strategic investment in the construction workforce
IM Srour, CT Haas, DP Morton
Journal of Construction Engineering and Management 132 (11), 1158-1166, 2006
672006
Are building occupants satisfied with indoor environmental quality of higher education facilities?
M El Asmar, A Chokor, I Srour
Energy procedia 50, 751-760, 2014
622014
A survey of absenteeism on construction sites
FJ Srour, I Srour, MG Lattouf
International Journal of Manpower 38 (4), 533-547, 2017
522017
Sustainable recycling approach: an understanding of designers' and contractors' recycling responsibilities throughout the life cycle of buildings in two US cities
I Srour, WK Chong, F Zhang
Sustainable Development 20 (5), 350-360, 2012
522012
Pilot-based assessment of the economics of recycling construction demolition waste
IM Srour, GR Chehab, M El-Fadel, S Tamraz
Waste Management & Research 31 (11), 1170-1179, 2013
512013
Learning curves in construction: A critical review and new model
F Jordan Srour, D Kiomjian, IM Srour
Journal of Construction Engineering and Management 142 (4), 06015004, 2016
502016
Using GIS and optimization to manage construction and demolition waste: The case of abandoned quarries in Lebanon
N AlZaghrini, FJ Srour, I Srour
Waste Management 95, 139-149, 2019
492019
Managing emergency construction and demolition waste in Syria using GIS
N Madi, I Srour
Resources, conservation and recycling 141, 163-175, 2019
452019
A numerical modeling approach to evaluate energy-efficient mechanical ventilation strategies
B Yassine, K Ghali, N Ghaddar, I Srour, G Chehab
Energy and Buildings 55, 618-630, 2012
442012
Data-driven machine learning approach to integrate field submittals in project scheduling
M Awada, FJ Srour, IM Srour
Journal of Management in Engineering 37 (1), 04020104, 2021
422021
Assessment of accessibility measures
C Bhat, S Handy, K Kockelman, H Mahmassani, Q Chen, I Srour, ...
Work 7, 4938-3, 2001
412001
An optimization-based model for maximizing the benefits of fast-track construction activities
Y Khoueiry, I Srour, A Yassine
Journal of the Operational Research Society 64 (8), 1137-1146, 2013
382013
A genetic algorithm based framework to model the relationship between building renovation decisions and occupants’ satisfaction with indoor environmental quality
M Awada, I Srour
Building and Environment 146, 247-257, 2018
352018
The system can't perform the operation now. Try again later.
Articles 1–20