An optimization model for operating room scheduling to reduce blocking across the perioperative process W Abedini, A., Ye, H.H., Li Procedia Manufacturing, 2017 | 56 | 2017 |
Operating room planning under surgery type and priority constraints A Abedini, H Ye, W Li Procedia Manufacturing 5, 15-25, 2016 | 49 | 2016 |
A metric-based framework for sustainable production scheduling A Abedini, W Li, F Badurdeen, IS Jawahir Journal of Manufacturing Systems 54, 174-185, 2020 | 35 | 2020 |
An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production W Li, BR Nault, D Xue, YL Tu Computers & Operations Research 38 (1), 267-276, 2011 | 32 | 2011 |
An effective and efficient heuristic for no-wait flow shop production to minimize total completion time H Ye, W Li, A Abedini, B Nault Computers & Industrial Engineering 108, 57-69, 2017 | 30 | 2017 |
An improved heuristic for no-wait flow shop to minimize makespan H Ye, W Li, A Abedini Journal of manufacturing systems 44, 273-279, 2017 | 29 | 2017 |
Optimisation of product family design with consideration of supply risk and discount XG Luo, W Li, CK Kwong, Y Cao Research in Engineering Design, 2015 | 28 | 2015 |
An effective heuristic for no-wait flow shop production to minimize makespan H Ye, W Li, E Miao Journal of Manufacturing Systems 40, 2-7, 2016 | 24 | 2016 |
An expert system for an emergency response management in networked safe service systems X Liu, W Li, YL Tu, WJ Zhang Expert Systems with Applications 38 (9), 11928-11938, 2011 | 23 | 2011 |
A heuristic for adaptive production scheduling and control in flow shop production W Li, XG Luo, D Xue, YL Tu International Journal of Production Research 49 (11), 3151-3170, 2011 | 21 | 2011 |
Optimal resource allocation for hybrid flow shop in one-of-a-kind production XG Luo, W Li, D Xue, JF Tang, YL Tu International Journal of Computer Integrated Manufacturing 23 (2), 146-154, 2010 | 21 | 2010 |
Quantifying impacts of product return uncertainty on economic and environmental performances of product configuration design R Aydin, A Brown, F Badurdeen, W Li, KE Rouch, IS Jawahir Journal of Manufacturing Systems 48, 3-11, 2018 | 20 | 2018 |
Dynamic bus dispatching using multiple types of real-time information W Luo, X.G., Liu, Y.X., Yu, Y., Tang, J.F., Li Transportmetrica B - Transport Dynamics, 2018 | 20 | 2018 |
Operator allocation planning for reconfigurable production line in one-of-a-kind production XG Luo, W Li, YL Tu, D Xue, JF Tang International Journal of Production Research 49 (3), 689-705, 2011 | 20 | 2011 |
The relationship between maximum completion time and total completion time in flowshop production D Li, W., Dai, H.H., Zhang Procedia Manufacturing 1, 146-156, 2015 | 18 | 2015 |
An effective heuristic for adaptive control of job sequences subject to variation in processing times W Li, TI Freiheit International Journal of Production Research, 2015 | 15 | 2015 |
Trade-off balancing in scheduling for flow shop production and perioperative processes W Li, BR Nault, H Ye European Journal of Operational Research 273 (3), 817-830, 2019 | 14 | 2019 |
Nickel-mediated reductive coupling of neopentyl bromides with activated alkenes at room temperature and its synthetic application Y Ouyang, Y Peng, WDZ Li Tetrahedron 75 (33), 4486-4496, 2019 | 13 | 2019 |
Trade-off balancing between maximum and total completion times for no-wait flow shop production H Ye, W Li, BR Nault International Journal of Production Research 58 (11), 3235-3251, 2020 | 12 | 2020 |
The effect of work content imbalance and its interaction with scheduling method on sequential flow line performance T Freiheit, W Li International Journal of Production Research 55 (10), 2791-2805, 2017 | 12 | 2017 |