Seguir
ALVARO JULIO CUADROS LOPEZ
ALVARO JULIO CUADROS LOPEZ
Industrial Engineering School. Universidad del Valle
Dirección de correo verificada de correounivalle.edu.co - Página principal
Título
Citado por
Citado por
Año
Customer segmentation model based on value generation for marketing strategies formulation
AJ Cuadros López, VE Domínguez
Estudios Gerenciales 30 (130), 25-30, 2014
902014
Methodology proposal to determine project management maturity level in engineering companies
AJ Cuadros López, JA Viveros Morales, AB Melendez Rojas
Revista EIA 14 (27), 85-95, 2017
37*2017
Análisis multivariado para segmentación de clientes basada en RFM
AJ Cuadros López, CG Caicedo, PCJ Oviedo
Tecnura 21 (54), 41-51, 2018
252018
Estado De La Gerencia De Proyectos En Pymes Del Sector Artes Gráficas Y Propuestas De Lineamientos Para Su Mejoramiento (State of Project Management in SMEs of the Printing …
Ó Rubiano Ovalle, A Cuadros Lopez
Sotavento, 2012
182012
A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
JC Paz, D Rozenboim, A Cuadros, S Cano, JW Escobar
Construction Economics and Building 18 (02), 41-69, 2018
162018
Modelo para evaluar la madurez en la gestión de proyectos en Pymes del sector artes gráficas
AJC López, CAM Rincón, JPO Cabrera
Revista Logos, Ciencia & Tecnología 10 (2), 39-56, 2018
112018
Project maturity evaluation model for SMEs from the software development sub-sector
AJ Cuadros López, C Galindres, P Ruiz
AD-minister, 147-162, 2016
72016
Beneficios del Tai Chi Chuan en la osteoartritis, el equilibrio y la calidad de vida
P Jiménez, A Meléndez, U Albers, A López
RICYDE 9 (32), 181-199, 2013
62013
Performance control considering risks for construction projects
A Cuadros, C Aguilar, V Rangel
Scientia et Technica 24 (02), 225-231, 2019
32019
Evaluation of the impact of schedule risks in a road infrastructure project
DR Soto, LR Cadavid, A OROBIOQuiñones, A Julio, C López
Evaluation 39 (47), 14, 2018
12018
Non-dominated NSGA-II genetic algorithm for schedule acceleration considering the discrete time-cost compensation problem (DTCTP) in a construction project
A Cuadros, J Villota, J Velasquez
Revista EIA 19 (38), 1-16, 2022
2022
The Use of Contingency Reserves to Analyze Risk Response Actions in Project Management
A Cuadros, L Rivera, A Orobio
International Conference on Industrial Engineering and Operations Management …, 2019
2019
Selection of Project Duration Forecast Method Using Earned Value Metrics
A Cuadros, JP Ibarguen, L Rivera
International Conference on Industrial Engineering and Operations Management …, 2018
2018
Probabilistic Project Management Based on Earned Value Management
A Cuadros, CI Aguilar, L Rangel, Lady Vanesa, Rivera
International Conference on Industrial Engineering and Operations Management …, 2018
2018
Evaluation of the Impact of Schedule Risks in a Road Infrastructure Project
D Ramírez, L Rivera, A Orobio, A Cuadros
Espacios 39 (47), 18, 2018
2018
Multivariate analysis for customer segmentation based on RFM
ÁJ Cuadros López, C Gonzales Caicedo, PC Jiménez Oviedo
Tecnura 21 (54), 41-51, 2017
2017
PROPOSTA METODOLÓGICA PARA MEDIR A MATURIDADE DA GERÊNCIA DE PROJETOS EM EMPRESAS DE ENGENHARIA
ÁJ Cuadros López, JA Morales Viveros, ÁB Rojas Meléndez
Revista EIA, 85-95, 2017
2017
Analisis multivariado para segmentacion de clientes basada en RFM
PCJ Oviedo, AJC López, CG Caicedo
2017
Modelo de segmentação do cliente baseado na criação de valor para a formulação de estratégias de marketing
AJ Cuadros, VE Domínguez
Estudios Gerenciales 30 (130), 25-30, 2014
2014
Estado De La Gerencia De Proyectos En Pymes Del Sector Artes Gráficas Y Propuestas De Lineamientos Para Su Mejoramiento (State of Project Management in SMEs of the Printing …
O Rubiano Ovalle, A Cuadros Lopez
Estado De La Gerencia De Proyectos En Pymes Del Sector Artes Gráficas Y …, 2013
2013
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20