Seguir
Ponz-Tienda; José Luis
Ponz-Tienda; José Luis
Plexos Software
Dirección de correo verificada de plexosproject.com - Página principal
Título
Citado por
Citado por
Año
The resource leveling problem with multiple resources using an adaptive genetic algorithm
JL Ponz-Tienda, V Yepes, E Pellicer, J Moreno-Flores
Automation in Construction 29, 161-172, 2013
1282013
Labor Productivity in the Construction Industry -Factors Influencing the Spanish Construction Labor Productivity-
SG G. Robles, A. Stifi, JL. Ponz-Tienda
International Journal of Civil, Architectural, Structural and Construction …, 2014
94*2014
A proposal for risk allocation in social infrastructure projects applying PPP in Colombia
LM Sastoque, CA Arboleda, JL Ponz
Procedia Engineering 145, 1354-1361, 2016
912016
Advances in Informatics and Computing in Civil and Construction Engineering: Proceedings of the 35th CIB W78 2018 Conference: IT in Design, Construction, and Management
I Mutis, T Hartmann
Springer, 2018
662018
Complete fuzzy scheduling and fuzzy earned value management in construction projects
JL Ponz-Tienda, E Pellicer, V Yepes
Journal of Zhejiang University-Science A 13 (1), 56-68, 2012
612012
The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
JD García‐Nieves, JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer
Computer‐Aided Civil and Infrastructure Engineering, 2018
592018
Improved adaptive harmony search algorithm for the resource leveling problem with minimal lags
JL Ponz-Tienda, A Salcedo-Bernal, E Pellicer, J Benlloch-Marco
Automation in Construction 77, 82-92, 2017
542017
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
JD García-Nieves, JL Ponz-Tienda, A Ospina-Alvarado, ...
Automation in construction 105, 102799, 2019
522019
Method for generation of rheological model to characterize non-conventional injection molding by means of spiral mold
I Clavería, C Javierre, L Ponz
Journal of Materials Processing Technology 162, 477-483, 2005
432005
A parallel branch and bound algorithm for the resource leveling problem with minimal lags
JL Ponz‐Tienda, A Salcedo‐Bernal, E Pellicer
Computer‐Aided Civil and Infrastructure Engineering 32 (6), 474-498, 2017
402017
The fuzzy project scheduling problem with minimal generalized precedence relations
JL Ponz‐Tienda, E Pellicer, J Benlloch‐Marco, C Andrés‐Romano
Computer‐Aided Civil and Infrastructure Engineering 30 (11), 872-891, 2015
392015
Influence of the recycled material percentage on the rheological behaviour of HDPE for injection moulding process
C Javierre, I Claveria, L Ponz, J Aísa, A Fernández
Waste management 27 (5), 656-663, 2007
362007
BIM use assessment (BUA) tool for characterizing the application levels of BIM uses for the planning and design of construction projects
MJ Rojas, RF Herrera, C Mourgues, JL Ponz-Tienda, LF Alarcón, ...
Advances in Civil Engineering 2019, 1-9, 2019
342019
The last planner system of construction planning and control as a teaching and learning tool
E Pellicer, F Cerveró, A Lozano, JL Ponz-Tienda
INTED2015 Proceedings, 4877-4884, 2015
342015
Energy innovation in the environmental Kuznets curve (EKC): a theoretical approach
D Balsalobre-Lorente, M Shahbaz, JL Ponz-Tienda, JM Cantos-Cantos
Carbon footprint and the industrial life cycle: From urban planning to …, 2017
332017
Interoperability of building energy modeling (BEM) with building information modeling (BIM)
AV Prada-Hernández, JS Rojas-Quintero, JA Vallejo-Borda, ...
Proceedings of the SIBRAGEC ELAGEC, 519-526, 2015
302015
Application of mixed-mode research paradigms to the building sector: A review and case study towards decarbonising the built and natural environment
T Ibn-Mohammed
Sustainable Cities and Society 35, 692-714, 2017
282017
Requirements for a BIM execution plan (BEP): a proposal for application in Colombia= Requisitos para un plan de ejecución de BIM (BEP): propuesta de aplicación en Colombia
JA Ramírez-Sáenz, JM Gómez-Sánchez, JLP Tienda, JPR Cortés, ...
Building & Management 2 (2), 5-14, 2018
252018
Comparación entre metodologías building information modeling (BIM) y metodologías tradicionales en el cálculo de cantidades de obra y elaboración de presupuestos. Caso de …
JA Ramírez León
202018
TEACHING AND LEARNING LEAN CONSTRUCTION IN SPAIN: A PIONEER EXPERIENCE
E Pellicer, JL Ponz-Tienda
22nd ANNUAL CONFERENCE of the INTERNATIONAL GROUP for LEAN CONSTRUCTON …, 2014
192014
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20