Follow
Malgorzata Sterna
Malgorzata Sterna
Politechnika Poznańska, Wydział Informatyki i Telekomunikacji, Instytut Informatyki
Verified email at cs.put.poznan.pl
Title
Cited by
Cited by
Year
The disjunctive graph machine representation of the job shop scheduling problem
J Błażewicz, E Pesch, M Sterna
European Journal of Operational Research 127 (2), 317-331, 2000
1212000
A survey of scheduling problems with late work criteria
M Sterna
Omega 39 (2), 120-129, 2011
1132011
Open shop scheduling problems with late work criteria
J Błażewicz, E Pesch, M Sterna, F Werner
Discrete Applied Mathematics 134 (1-3), 1-24, 2004
772004
The two-machine flow-shop problem with weighted late work criterion and common due date
J Błażewicz, E Pesch, M Sterna, F Werner
European Journal of Operational Research 165 (2), 408-415, 2005
692005
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date
J Blazewicz, E Pesch, M Sterna, F Werner
Computers & Operations Research 35 (2), 574-599, 2008
632008
Scheduling on parallel identical machines with late work criterion: Offline and online cases
X Chen, M Sterna, X Han, J Blazewicz
Journal of Scheduling 19, 729-736, 2016
602016
A comparison of solution procedures for two-machine flow shop scheduling with late work criterion
J Blazewicz, E Pesch, M Sterna, F Werner
Computers & Industrial Engineering 49 (4), 611-624, 2005
492005
Late and early work scheduling: A survey
M Sterna
Omega 104, 102453, 2021
412021
Late work minimization in flow shops by a genetic algorithm
E Pesch, M Sterna
Computers & Industrial Engineering 57 (4), 1202-1209, 2009
382009
Problems and algorithms in non-classical shop scheduling
M Sterna
Scientific Publishers OWN [Ośrodek Wydawnictw Naukowych], 2000
362000
Late work minimization in a small flexible manufacturing system
M Sterna
Computers & Industrial Engineering 52 (2), 210-228, 2007
352007
A note on the two machine job shop with the weighted late work criterion
J Blazewicz, E Pesch, M Sterna, F Werner
Journal of Scheduling 10 (2), 87-95, 2007
332007
Total late work criteria for shop scheduling problems
J Błażewicz, E Pesch, M Sterna, F Werner
Operations Research Proceedings 1999: Selected Papers of the Symposium on …, 2000
322000
Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work
M Sterna, K Czerniachowska
Journal of Optimization Theory and Applications 174, 927-944, 2017
312017
Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date
X Chen, Y Liang, M Sterna, W Wang, J Błażewicz
European Journal of Operational Research 284 (1), 67-74, 2020
302020
A novel representation of graph structures in web mining and data analysis
J Błażewicz, E Pesch, M Sterna
Omega 33 (1), 65-71, 2005
302005
Complexity of late work minimization in flow shop systems and a particle swarm optimization algorithm for learning effect
X Chen, V Chau, P Xie, M Sterna, J Błażewicz
Computers & Industrial Engineering 111, 176-182, 2017
292017
Handbook on scheduling: From theory to practice
J Błażewicz, K Ecker, E Pesch, G Schmidt, M Sterna, J Węglarz
Springer, 2019
242019
Metaheuristics for late work minimization in two-machine flow shop with common due date
J Blazewicz, E Pesch, M Sterna, F Werner
KI 2005: Advances in Artificial Intelligence: 28th Annual German Conference …, 2005
242005
Dominance relations for two-machine flow shop problem with late work criterion
M Sterna
Bulletin of the Polish Academy of Sciences Technical Sciences, 59-69-59-69, 2007
212007
The system can't perform the operation now. Try again later.
Articles 1–20