Seguir
Rachid CHAIB
Rachid CHAIB
professeur
Dirección de correo verificada de umc.edu.dz - Página principal
Título
Citado por
Citado por
Año
Contribution to the optimization of strategy of maintenance by lean six sigma
A Youssouf, C Rachid, V Ion
Physics procedia 55, 512-518, 2014
732014
Preserving and improving the safety and health at work: Case of Hamma Bouziane cement plant (Algeria)
C Rachid, V Ion, C Irina, B Mohamed
Safety Science 76, 145-150, 2015
482015
Analysis of risk and the strengthening of the safety technical barriers: application of Skikda (Algeria) oil refining complex
L Ait Ouffroukh, R Chaib, V Ion, L Khochmane
World Journal of Engineering 15 (1), 99-109, 2018
262018
On the contribution to the alignment during an organizational change: Measurement of job satisfaction with working conditions
W Boulagouas, S García-Herrero, R Chaib, SH García, M Djebabra
Journal of safety research 76, 289-300, 2021
202021
Artificial intelligence treating the problem of uncertainty in quantitative risk analysis (QRA)
MS Hellas, R Chaib, I Verzea
journal of engineering, design and technology 18 (1), 40-54, 2020
202020
An investigation into unsafe behaviors and traffic accidents involving unlicensed drivers: a perspective for alignment measurement
W Boulagouas, S García-Herrero, R Chaib, JD Febres, MÁ Mariscal, ...
International Journal of Environmental Research and Public Health 17 (18), 6743, 2020
182020
A Safe and Sustainable Development in a hygiene and healthy company using decision matrix risk assessment technique: a case study
R Kharzi, R Chaib, I Verzea, A Akni
Journal of Mining and Environment 11 (2), 363-373, 2020
182020
Well-being at work: A lever for sustainable performance in workplace
M Amrani, R Chaib, A Bouzaouit, V Ion
Mining Science 27, 2020
152020
Investigation into Brinell hardness test applied to rocks
A Boutrid, S Bensehamdi, R Chaib
World Journal of Engineering 10 (4), 367-380, 2013
132013
Vulnerability assessment for major industrial risks proposal for a semiquantitative analysis method (VAMIR) application: oil and gas industry
M Hassani, R Chaib, R Bouzerara
Journal of Failure Analysis and Prevention 20, 1568-1582, 2020
122020
Map risks in the company: highlight at the top priority risks
MS Aouati, R Chaib, I Cozminca, I Verzea
World Journal of Engineering 14 (6), 550-555, 2017
122017
Promoting a sustainable organizational culture in a company: The National Railway Transport Company
A Abdelatif, C Rachid, A Smain, V Ion
Journal of Rail Transport Planning & Management 5 (1), 23-30, 2015
122015
Failure: a source of progress in maintenance and design
R Chaïb, M Taleb, M Benidir, I Verzea, A Bellaouar
Physics Procedia 55, 185-191, 2014
122014
Factors influencing slurry rheology
A Benretem, M Benidir, R Chaib
World Pumps 2010 (7), 30-32, 2010
122010
Quantitative risk analysis detailed study of thermal and overpressure risks case study
MS Hellas, R Chaib, I Verzea
Journal of RECENT 19 (3), 56, 2018
112018
Promoting a culture of health and safety at work: safety–a permanent priority
R Chaib, I Verzea, M Benidir, M Taleb
WIT Transactions on Information and Communication Technologies 44, 405-413, 2012
112012
For better control of the availability of the industrial equipments
R Chaib, A Bellaouar, M Benidir, I Verzea
Recent 11 (28), 7-10, 2010
112010
Contribution à l’optimisation de la maintenance conditionnelle par l’analyse vibratoire
R Chaib
These, University of Mentouri-Constantine, Algérie, 2006
112006
Reduction of the vulnerability zone of a major industrial risk. Case of BLEVE in LPG storage sphere Hassi R'Mel, Algeria
M Hassani, R Chaib, R Bouzerara
RECENT Journal 19 (2), 97-107, 2018
102018
An overview of Constantine’s tram safety
A Kahlouche, R Chaib
Transport and Telecommunication Journal 18 (4), 324-331, 2017
102017
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20