Follow
Dr. Luis Barberá Martínez
Title
Cited by
Cited by
Year
Propuesta de un modelo de gestión de mantenimiento y sus principales herramientas de apoyo
P Viveros, R Stegmaier, F Kristjanpoller, L Barbera, A Crespo
Ingeniare. Revista chilena de ingeniería 21 (1), 125-138, 2013
3412013
Advanced model for maintenance management in a continuous improvement cycle: integration into the business strategy
L Barberá, A Crespo, P Viveros, R Stegmaier
International Journal of System Assurance Engineering and Management 3, 47-63, 2012
922012
A practical method for the maintainability assessment in industrial devices using indicators and specific attributes
PM De Leon, VGP Díaz, LB Martínez, AC Marquez
Reliability Engineering & System Safety 100, 84-92, 2012
772012
The graphical analysis for maintenance management method: a quantitative graphical analysis to support maintenance management decision making
LB Martínez, AC Márquez, PV Gunckel, AA Andreani
Quality and Reliability Engineering International 29 (1), 77-87, 2013
502013
Value-driven engineering of E-maintenance platforms
M Macchi, A Crespo Márquez, M Holgado, L Fumagalli, ...
Journal of Manufacturing Technology Management 25 (4), 568-598, 2014
392014
Dynamic analytic hierarchy process: AHP method adapted to a changing environment
V González-Prida, P Viveros, L Barberá, A Crespo Márquez
Journal of Manufacturing Technology Management 25 (4), 457-475, 2014
392014
Root cause analysis to identify physical causes
G Medina-Oliva, B Iung, L Barberá, P Viveros, T Ruin
11th International Probabilistic Safety Assessment and Management Conference …, 2012
382012
Contractual and quality aspects on warranty: best practices for the warranty management and its maturity assessment
V González‐Prida Díaz, L Barberá Martínez, JF Gómez Fernández, ...
International Journal of Quality & Reliability Management 29 (3), 320-348, 2012
362012
Dynamic analytic hierarchy process: AHP method adapted to a changing environment
V González-Prida, L Barberá, P Viveros, A Crespo
IFAC Proceedings Volumes 45 (31), 25-29, 2012
322012
Real-time trajectory generation for car-like vehicles navigating dynamic environments
V Delsart, T Fraichard, L Martinez
2009 IEEE international conference on robotics and automation, 3401-3406, 2009
322009
A case study of GAMM (graphical analysis for maintenance management) in the mining industry
L Barberá, A Crespo, P Viveros, R Stegmaier
Reliability Engineering & System Safety 121, 113-120, 2014
262014
Ecological indicators for water management in agriculture
F Rodriguez, L Martinez
Ecological Indicators 39, 101-116, 2023
202023
Portion of a display screen with graphical user interface for an online portal
J Parks, L Martinez, K Kinsey
US Patent App. 29/638,426, 2020
182020
Practical application of a RAMS analysis for the improvement of the warranty management
VG Díaz, LB Martínez, AC Márquez
IFAC Proceedings Volumes 43 (3), 50-55, 2010
172010
Advances in PHM application frameworks: Processing methods, prognosis models, decision making
A Guillen, J Gómez, A Crespo, AG Bolanos, A Sola, L Barbera
Chemical Engineering Transactions 33, 391-396, 2013
162013
Revisión de herramientas software para el análisis de la fiabilidad, disponibilidad, mantenibilidad y seguridad (RAMS) de equipos industriales
L Barberá, V González, A Crespo, P Moreu
Revista de Ingeniería y Gestión de Mantenimiento 68, 2010
162010
Graphical analysis for operation management: a graphical method to support operation decision making
P Viveros Gunckel, A Crespo Márquez, L Barberá Martinez, ...
Quality and Reliability Engineering International 32 (7), 2299-2311, 2016
152016
Proposal of a maintenance management model and its main support tools
P Viveros, P Stegmaier, F Kristjanpoller, L Barbera, A Crespo
Ingeniare 21 (1), 125-138, 2013
152013
Biomethanation plant assessment based on reliability impact on operational effectiveness
F Kristjanpoller, A Crespo, L Barberá, P Viveros
Renewable Energy 101, 301-310, 2017
142017
State of the art of maintenance applied to wind turbines
L Barberá, A Guerrero, A Crespo, V González-Prida, A Guillén, J Gómez, ...
Chemical Engineering 33, 2013
132013
The system can't perform the operation now. Try again later.
Articles 1–20