Genetic-algorithm-based optimization approach for energy management
A Arabali, M Ghofrani, M Etezadi-Amoli, MS Fadali, Y Baghzouz
IEEE Transactions on Power Delivery 28 (1), 162-170, 2012
4302012
A framework for optimal placement of energy storage units within a power system with high wind penetration
M Ghofrani, A Arabali, M Etezadi-Amoli, MS Fadali
IEEE Transactions on Sustainable Energy 4 (2), 434-442, 2013
2932013
Stochastic performance assessment and sizing for a hybrid power system of solar/wind/energy storage
A Arabali, M Ghofrani, M Etezadi-Amoli, MS Fadali
IEEE Transactions on Sustainable Energy 5 (2), 363-371, 2013
2672013
A multi-objective transmission expansion planning framework in deregulated power systems with wind generation
A Arabali, M Ghofrani, M Etezadi-Amoli, MS Fadali, M Moeini-Aghtaie
IEEE Transactions on Power Systems 29 (6), 3003-3011, 2014
1642014
Smart scheduling and cost-benefit analysis of grid-enabled electric vehicles for wind power integration
M Ghofrani, A Arabali, M Etezadi-Amoli, MS Fadali
IEEE Transactions on Smart grid 5 (5), 2306-2313, 2014
1422014
Energy storage application for performance enhancement of wind integration
M Ghofrani, A Arabali, M Etezadi-Amoli, MS Fadali
IEEE Transactions on Power Systems 28 (4), 4803-4811, 2013
1322013
Fault location in distribution networks by compressive sensing
M Majidi, A Arabali, M Etezadi-Amoli
IEEE Transactions on Power Delivery 30 (4), 1761-1769, 2014
1282014
A hybrid short-term load forecasting with a new input selection framework
M Ghofrani, M Ghayekhloo, A Arabali, A Ghayekhloo
Energy 81, 777-786, 2015
1272015
Optimal siting of DG units in power systems from a probabilistic multi-objective optimization perspective
P Dehghanian, SH Hosseini, M Moeini-Aghtaie, A Arabali
International Journal of Electrical Power & Energy Systems 51, 14-26, 2013
1032013
Optimal charging/discharging of grid-enabled electric vehicles for predictability enhancement of PV generation
M Ghofrani, A Arabali, M Ghayekhloo
Electric Power Systems Research 117, 134-142, 2014
632014
Cost analysis of a power system using probabilistic optimal power flow with energy storage integration and wind generation
A Arabali, M Ghofrani, M Etezadi-Amoli
International Journal of Electrical Power & Energy Systems 53, 832-841, 2013
552013
Flexible-voltage DC-bus operation for reduction of switching losses in all-electric ship power systems
M Farasat, A Arabali, AM Trzynadlowski
IEEE Transactions on Power Electronics 29 (11), 6151-6161, 2014
302014
Modeling and simulation of a DFIG-based wind-power system for stability analysis
MEA M Ghofrani, A Arabali
IEEE Power and Energy Society General Meeting, 2012
29*2012
Probabilistic multi‐objective transmission investment and expansion planning
A Arabali, SH Hosseini, M Moeini‐Aghtaie
International Transactions on Electrical Energy Systems 25 (9), 1884-1904, 2015
272015
GA-based optimal power flow for microgrids with DC distribution network
M Farasat, S Mehraeen, A Arabali, A Trzynadlowski
2015 IEEE Energy Conversion Congress and Exposition (ECCE), 3372-3379, 2015
262015
Electric drive vehicle to grid synergies with large scale wind resources
M Ghofrani, A Arabali, M Etezadi-Amoli
2012 IEEE Power and Energy Society General Meeting, 1-6, 2012
262012
Line outage identification-based state estimation in a power system with multiple line outages
A Arabali, M Majidi, MS Fadali, M Etezadi-Amoli
Electric Power Systems Research 133, 79-86, 2016
222016
Optimum sizing and siting of renewable-energy-based DG units in distribution systems
A Arabali, M Ghofrani, JB Bassett, M Pham, M Moeini-Aghtaei
Optimization in Renewable Energy Systems, 233-277, 2017
212017
Voltage and power control for minimising converter and distribution losses in autonomous microgrids
M Farasat, A Arabali
IET Generation, Transmission & Distribution 9 (13), 1614-1620, 2015
182015
A new multiple line outage identification formulation using a sparse vector recovery technique
A Arabali, M Ghofrani, M Farasat
Electric power systems research 142, 237-248, 2017
142017