A new repair–replace strategy for items sold with a two-dimensional warranty BP Iskandar, DNP Murthy, N Jack Computers & Operations Research 32 (3), 669-682, 2005 | 178 | 2005 |
A repair–replace strategy based on usage rate for items sold with a two-dimensional warranty N Jack, BP Iskandar, DNP Murthy Reliability Engineering & System Safety 94 (2), 611-617, 2009 | 166 | 2009 |
Two-dimensional failure-free warranty policies: two-dimensional point process models DNP Murthy, BP Iskandar, RJ Wilson Operations research 43 (2), 356-366, 1995 | 153 | 1995 |
Repair-replace strategies for two-dimensional warranty policies BP Iskandar, DNP Murthy Mathematical and computer modelling 38 (11-13), 1233-1242, 2003 | 123 | 2003 |
Optimal preventive maintenance for a two dimensional lease contract BP Iskandar, H Husniah Computers & Industrial Engineering 113, 693-703, 2017 | 50 | 2017 |
Reliability and warranty analysis of a motorcycle based on claims data BP Iskandar, WR Blischke Case studies in reliability and maintenance, 623-656, 2002 | 40 | 2002 |
Maintenance service contracts for equipment sold with two dimensional warranties BP Iskandar, H Husniah, US Pasaribu Quality Technology & Quantitative Management 11 (3), 321-333, 2014 | 36 | 2014 |
Last time buy decisions for products sold under warranty M van der Heijden, BP Iskandar European journal of operational research 224 (2), 302-312, 2013 | 31 | 2013 |
An opportunity-based age replacement policy considering warranty BP Iskandar, H Sandoh International Journal of Reliability, Quality and Safety Engineering 6 (03 …, 1999 | 24 | 1999 |
A new shock damage model: Part II—Optimal maintenance policies DNP Murthy, BP Iskandar Reliability Engineering & System Safety 31 (2), 211-231, 1991 | 24 | 1991 |
Two-dimensional combination warranty policies BP Iskandar, RJ Wilson, DNP Murthy RAIRO-Operations Research 28 (1), 57-75, 1994 | 23 | 1994 |
An extended opportunity-based age replacement policy BP Iskandar, H Sandoh RAIRO-Operations Research-Recherche Opérationnelle 34 (2), 145-154, 2000 | 20 | 2000 |
Warranty servicing with imperfect repair for products sold with a two-dimensional warranty BP Iskandar, N Jack Replacement models with minimal repair, 163-175, 2011 | 19 | 2011 |
Comments on “Maintenance policies with two-dimensional warranty” N Jack, DNP Murthy, BP Iskandar Reliability Engineering & System Safety 82 (1), 105-109, 2003 | 19 | 2003 |
Two-dimensional renewal function solver BP Iskandar Research report 4, 91, 1991 | 16 | 1991 |
Modelling and analysis of two-dimensional warranty policies BP Iskandar | 14 | 1992 |
A new shock damage model: Part I—Model formulation and analysis DNP Murthy, BP Iskandar Reliability Engineering & System Safety 31 (2), 191-208, 1991 | 14 | 1991 |
Warranty cost analysis for a multi-component product protected by lemon laws H Husniah, US Pasaribu, BP Iskandar IOP conference series: materials science and engineering 1003 (1), 012110, 2020 | 11 | 2020 |
Performance-based maintenance contract for equipments used in mining industry H Husniah, US Pasaribu, A Cakravastia, BP Iskandar 2014 IEEE international conference on management of innovation and …, 2014 | 11 | 2014 |
Two new servicing strategies for products sold with warranty BP Iskandar, N Jack, DNP Murthy Asia-Pacific Journal of Operational Research 29 (03), 1240022, 2012 | 11 | 2012 |