Sara Hatami
Sara Hatami
Knowledge Transfer, Business Developer & Corporate Relations, Universitat Oberta de Catalunya
Correu electrònic verificat a uoc.edu
Títol
Citada per
Citada per
Any
The distributed assembly permutation flowshop scheduling problem
S Hatami, R Ruiz, C Andres-Romano
International Journal of Production Research 51 (17), 5292-5308, 2013
782013
Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times
S Hatami, R Ruiz, C Andrés-Romano
International Journal of Production Economics 169, 76-88, 2015
652015
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
S Hatami, S Ebrahimnejad, R Tavakkoli-Moghaddam, Y Maboudian
The International Journal of Advanced Manufacturing Technology 50 (9-12 …, 2010
472010
A biased-randomized simheuristic for the distributed assembly permutation flowshop problem with stochastic processing times
EM Gonzalez-Neira, D Ferone, S Hatami, AA Juan
Simulation Modelling Practice and Theory 79, 23-36, 2017
462017
A simheuristic algorithm to set up starting times in the stochastic parallel flowshop problem
S Hatami, L Calvet, V Fernández-Viagas, JM Framiñán, AA Juan
Simulation Modelling Practice and Theory 86, 55-71, 2018
132018
The Distributed Assembly Parallel Machine Scheduling Problem with eligibility constraints.
S Hatami, RR García, CA Romano
International Journal of Production Management and Engineering 3 (1), 13-23, 2015
112015
The three stage assembly permutation flowshop scheduling problem
C Andrés, S Hatami
V international conference on industrial engineering and industrial …, 2011
92011
Simple constructive heuristics for the Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times
S Hatami, R Ruiz, C Andrés-Romano
2014 International Conference on Control, Decision and Information …, 2014
72014
Heuristics for a distributed parallel machine assembly scheduling problem with eligibility constraints
S Hatami, R Ruiz, C Andrés-Romano
2015 International Conference on Industrial Engineering and Systems …, 2015
52015
Two simple constructive algorithms for the distributed assembly permutation flowshop scheduling problem
S Hatami, R Ruiz, CA Romano
Managing Complexity, 139-145, 2014
52014
A biased‐randomized iterated local search for the distributed assembly permutation flow‐shop problem
D Ferone, S Hatami, EM González‐Neira, AA Juan, P Festa
International Transactions in Operational Research 27 (3), 1368-1391, 2020
42020
Enhanced multi-directional local search for the bi-objective heterogeneous vehicle routing problem with multiple driving ranges
M Eskandarpour, D Ouelhadj, S Hatami, AA Juan, B Khosravi
European Journal of Operational Research 277 (2), 479-491, 2019
42019
The Distributed and Assembly Scheduling Problem
S Hatami
22016
An assembly flow-shop scheduling problem with sequence-dependent setup and transportation times
Y Maboudian, S Ebrahimnejad, R Tavakkoli-Moghaddam, S Hatami
International Journal of Industrial Engineering & Production Management 21 …, 2010
22010
Green hybrid fleets using electric vehicles: solving the heterogeneous vehicle routing problem with multiple driving ranges and loading capacities
S Hatami, M Eskandarpour, M Chica, AA Juan, D Ouelhadj
SORT-Statistics and Operations Research Transactions, 141-170, 2020
2020
Using biased-randomized algorithms for the multi-period product display problem with dynamic attractiveness
M Marmol, LC Martins, S Hatami, AA Juan, V Fernandez
Algorithms 13 (2), 34, 2020
2020
Using simulation and reliability concepts to set starting times in multitask projects with a common deadline
ÁA Juan Pérez, L Calvet Liñán, C Serrat Piè, S Hatami
Proceedings of the European Modeling and Simulation Symposium, 2017, 227-232, 2017
2017
زمانبندی جریان کارگاهی مونتاژ با زمان آمادهسازی وابسته به توالی و زمان حمل و نقل
Y Maboudian, S Ebrahimnejad, R Tavakkoli-Moghaddam, S Hatami
نشریه بین المللی مهندسی صنایع و مدیریت تولید 21 (1), 15-23, 2010
2010
Structure and Environmental Challenges Analysis in Projects Management Using Analytical
Y Maboudian, S Ebrahimnejad, R Tavakkoli-Moghaddam, S Hatami, ...
Part I: Decision and Optimization
V Farrokhi, F Herrmann, I Kacem, L Pokorádi, P Healy, A Jiménez-Martín, ...
En aquests moments el sistema no pot dur a terme l'operació. Torneu-ho a provar més tard.
Articles 1–20