Mostafa Zandieh
Títol
Citada per
Citada per
Any
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
M Zandieh, SMTF Ghomi, SMM Husseini
Applied Mathematics and Computation 180 (1), 111-127, 2006
2712006
Flexible job-shop scheduling with parallel variable neighborhood search algorithm
M Yazdani, M Amiri, M Zandieh
Expert Systems with Applications 37 (1), 678-687, 2010
2632010
An artificial immune algorithm for the flexible job-shop scheduling problem
A Bagheri, M Zandieh, I Mahdavi, M Yazdani
Future Generation Computer Systems 26 (4), 533-541, 2010
2502010
Scheduling trucks in cross-docking systems: Robust meta-heuristics
B Vahdani, M Zandieh
Computers & Industrial Engineering 58 (1), 12-24, 2010
2162010
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
B Naderi, M Zandieh, AKG Balagh, V Roshanaei
Expert systems with Applications 36 (6), 9625-9633, 2009
1782009
Multi-objective scheduling of dynamic job shop using variable neighborhood search
MA Adibi, M Zandieh, M Amiri
Expert Systems with Applications 37 (1), 282-287, 2010
1752010
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
E Moradi, SMTF Ghomi, M Zandieh
Expert systems with applications 38 (6), 7169-7178, 2011
1542011
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage
ARB Arabani, SMTF Ghomi, M Zandieh
Expert systems with Applications 38 (3), 1964-1979, 2011
1452011
A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem
SHA Rahmati, M Zandieh
The International Journal of Advanced Manufacturing Technology 58 (9-12 …, 2012
1342012
A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem
E Shokrollahpour, M Zandieh, B Dorri
International Journal of Production Research 49 (11), 3087-3103, 2011
1292011
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
J Behnamian, M Zandieh, SMTF Ghomi
Expert Systems with Applications 36 (6), 9637-9644, 2009
1252009
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
J Behnamian, SMTF Ghomi, M Zandieh
Expert Systems with Applications 36 (8), 11057-11069, 2009
1212009
Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach
N Karimi, M Zandieh, HR Karamooz
Expert Systems with Applications 37 (6), 4024-4032, 2010
1182010
Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness
B Naderi, M Zandieh, V Roshanaei
The International Journal of Advanced Manufacturing Technology 41 (11-12 …, 2009
1142009
Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop
M Gholami, M Zandieh
Journal of Intelligent Manufacturing 20 (4), 481, 2009
1092009
Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns
M Gholami, M Zandieh, A Alem-Tabriz
The International Journal of Advanced Manufacturing Technology 42 (1-2), 189-201, 2009
1022009
Algorithms for a realistic variant of flowshop scheduling
B Naderi, R Ruiz, M Zandieh
Computers & Operations Research 37 (2), 236-246, 2010
1012010
A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties
J Behnamian, M Zandieh
Expert Systems with Applications 38 (12), 14490-14498, 2011
1002011
A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms
E Ahmadi, M Zandieh, M Farrokh, SM Emami
Computers & Operations Research 73, 56-66, 2016
972016
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop
E Torabzadeh, M Zandieh
Advances in Engineering Software 41 (10-11), 1238-1243, 2010
912010
En aquests moments el sistema no pot dur a terme l'operació. Torneu-ho a provar més tard.
Articles 1–20