Follow
Antonio Sánchez Herguedas
Antonio Sánchez Herguedas
Universidad de Sevilla, 14 year in Rolls Royce Power Systems
Verified email at us.es
Title
Cited by
Cited by
Year
Monte Carlo-Based assessment of system availability. A case study for cogeneration plants.
AC Márquez, AS Herguedas, B Iung
Reliability Engineering and System Safety 88 (3), 273-289, 2005
1312005
Models for maintenance optimization: A study for repairable systems and finite time periods
AC Márquez, AS Herguedas
Reliability Engineering and System Safety 75 (3), 367-377, 2002
1112002
Learning about failure root causes through maintenance records analysis
A Crespo Márquez, A Sánchez Herguedas
Journal of Quality in Maintenance Engineering 10 (4), 254-262, 2004
572004
Maintenance Policies for a Production System With Constrained Production Rate and Buffer Capacity
AC Márquez, JND Gupta, AS Herguedas
International Journal of Production Research 41 (9), 1909-1926, 2003
402003
A new analytical method to optimise the preventive maintenance interval by using a semi-Markov process and z-transform with an application to marine diesel engines
A Sánchez-Herguedas, Á Mena-Nieto, F Rodrigo-Muñoz
Reliability Engineering and System Safety, 2021
232021
Ingeniería de mantenimiento: técnicas y métodos de aplicación a la fase operativa de los equipos
AC Márquez, PM de León, AJS Herguedas
Ediciones AENOR, 2004
222004
Optimizing preventive maintenance over a finite planning horizon in a semi-Markov framework
A Sánchez-Herguedas, A Crespo-Màrquez, F Rodrigo-Muñoz
IMA Journal of Management Mathematics, 2022
102022
Moreu de León, P
A Crespo Márquez, A Sanchez Herguedas
Sánchez Herguedas, A. Ingeniería De Mantenimiento. Técnicas y Métodos De …, 2004
52004
A method for obtaining the preventive maintenance interval in the absence of failure time data
A Sánchez-Herguedas, Á Mena-Nieto, F Rodrigo-Muñoz
Eksploatacja i Niezawodność 24 (3), 2022
42022
Optimisation of Maintenance Policies Based on Right-Censored Failure Data Using a Semi-Markovian Approach
A Sánchez-Herguedas, Á Mena-Nieto, F Rodrigo-Muñoz, J Villalba-Díez, ...
Sensors, 1424-8220 22 (4), 1432, 2022
32022
Optimising the Preventive Maintenance Interval Using a Semi-Markov Process, Z-Transform, and Finite Planning Horizon
A Sánchez-Herguedas, A Crespo-Márquez, F Rodrigo-Muñoz
Cases on Optimizing the Asset Management Process, 137-161, 2021
22021
Ingeniería de mantenimiento.
AC Márquez, PM de León, AS Herguedas
Omega 28, 277-292, 2004
22004
Análisis y diseño de políticas de mantenimiento mediante métodos cuantitativos (II)
AC Márquez, AS Herguedas
Revista Mantenimiento. España 86, 17-22, 1995
2*1995
Influence of the Income from the Use of an Asset on the Calculation of its preventive interval for a planned horizon. Use of semi-Markov processes and degraded state
A Sánchez-Herguedas, A Crespo Márquez, F Rodrigo-Muñoz
World Congress on Engineering Asset Management, 533-543, 2022
12022
Aplicación de enfoques Semimarkovianos a la mejora de políticas de mantenimiento predeterminado en activos industriales
A Sánchez-Herguedas, A Mena-Nieto, F Rodrigo-Muñoz, J Villalba-Diez, ...
Actas de las IV Jornadas ScienCity 2021 Fomento de la Cultura Científica …, 2022
12022
Actas de las IV Jornadas ScienCity 2021. Fomento de la Cultura Científica, Tecnológica y de Innovación en Ciudades Inteligentes
O Segura Bonilla, D García Sánchez, ÁI Mena Nieto, AA Golpe Moya, ...
Universidad de Huelva, 2022
2022
Ciclo de Mejora en el Aula (CIMA) para el desarrollo de las actividades de mantenimiento
AJS Herguedas, I Empresas
Ciclos de mejora en el aula. Año 2021: experiencias de innovación docente de …, 2022
2022
Ciclo de Mejora en el Aula para una gestión básica del mantenimiento
AS Herguedas
Ciclos de mejora en el aula año 2020: experiencias de innovación docente de …, 2021
2021
Ciclo de mejora en el aula para la elaboración de un plan de mantenimiento bajo el método RCM
AS Herguedas
Ciclos de mejora en el aula, año 2019: Experiencias de innovación docente de …, 2020
2020
Ingeniería de mantenimiento [Texto impreso]: técnicas y métodos de aplicación a la fase operativa de los equipos
A Crespo Márquez, P Moreu de León, AJ Sánchez Herguedas
Madrid AENOR, 2013
2013
The system can't perform the operation now. Try again later.
Articles 1–20