Seguir
Ashraf Elazouni
Ashraf Elazouni
Associate Professor at Sultan Qaboos University
Dirección de correo verificada de squ.edu.om
Título
Citado por
Citado por
Año
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
AM Elazouni, FG Metwally
Journal of Construction Engineering and Management 131 (4), 400-412, 2005
1422005
Finance-based scheduling of construction projects using integer programming
AM Elazouni, AA Gab-Allah
Journal of construction engineering and management 130 (1), 15-24, 2004
1322004
D-SUB: Decision support system for subcontracting construction works
AM Elazouni, FG Metwally
Journal of construction engineering and management 126 (3), 191-200, 2000
992000
Heuristic method for multi‐project finance‐based scheduling
A Elazouni
Construction Management and Economics 27 (2), 199-211, 2009
872009
Expanding finance-based scheduling to devise overall-optimized project schedules
AM Elazouni, FG Metwally
Journal of Construction Engineering and Management 133 (1), 86-90, 2007
692007
Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities
MM Ali, A Elazouni
Construction management and economics 27 (9), 839-856, 2009
652009
Generic scheduling optimization model for multiple construction projects
MS El-Abbasy, A Elazouni, T Zayed
Journal of computing in civil engineering 31 (4), 04017003, 2017
632017
Estimating the acceptability of new formwork systems using neural networks
AM Elazouni, AE Ali, RH Abdel-Razek
Journal of Construction Engineering and management 131 (1), 33-41, 2005
632005
Discrete-event simulation-based method for staffing highway maintenance crews
AM Elazouni
US Patent 5,617,342, 1997
601997
Multiobjective evolutionary finance-based scheduling: Entire projects’ portfolio
MA Abido, AM Elazouni
Journal of Computing in Civil Engineering 25 (1), 85-97, 2011
572011
Classifying construction contractors using unsupervised-learning neural networks
AM Elazouni
Journal of construction engineering and management 132 (12), 1242-1253, 2006
542006
Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio
A Elazouni, M Abido
Automation in Construction 20 (7), 755-766, 2011
482011
Estimating resource requirements at conceptual design stage using neural networks
AM Elazouni, IA Nosair, YA Mohieldin, AG Mohamed
Journal of Computing in Civil Engineering 11 (4), 217-223, 1997
471997
MOSCOPEA: Multi-objective construction scheduling optimization using elitist non-dominated sorting genetic algorithm
MS El-Abbasy, A Elazouni, T Zayed
Automation in Construction 71, 153-170, 2016
462016
Method and apparatus for finance-based scheduling of construction projects
A Elazouni
US Patent 7,644,007, 2010
432010
Performance of shuffled frog-leaping algorithm in finance-based scheduling
A Alghazi, SZ Selim, A Elazouni
Journal of computing in civil engineering 26 (3), 396-408, 2012
402012
Improved genetic algorithm for finance-based scheduling
A Alghazi, A Elazouni, S Selim
Journal of Computing in Civil Engineering 27 (4), 379-394, 2013
372013
Evaluating the performance of construction equipment operators in Egypt
AM Elazouni, IM Basha
Journal of construction engineering and management 122 (2), 109-114, 1996
361996
Progress monitoring method
A Elazouni, O Salem
US Patent App. 13/558,195, 2012
322012
Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms
MS El-Abbasy, A Elazouni, T Zayed
Automation in Construction 120, 103392, 2020
292020
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20