Follow
Federico Barber
Federico Barber
Professor of Computer Science, Technical University of Valencia (Spain)
Verified email at dsic.upv.es - Homepage
Title
Cited by
Cited by
Year
An assessment of railway capacity
M Abril, F Barber, L Ingolotti, MA Salido, P Tormos, A Lova
Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008
6382008
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
A Lova, P Tormos, M Cervantes, F Barber
International Journal of Production Economics 117 (2), 302-316, 2009
2422009
A genetic algorithm for energy-efficiency in job-shop scheduling
MA Salido, J Escamilla, A Giret, F Barber
The International Journal of Advanced Manufacturing Technology 85, 1303-1314, 2016
1542016
A genetic algorithm for railway scheduling problems
P Tormos, A Lova, F Barber, L Ingolotti, M Abril, MA Salido
Metaheuristics for scheduling in industrial and manufacturing applications …, 2008
1102008
Multi-mode resource constrained project scheduling: Scheduling schemes, priority rules and mode selection rules
A Lova, P Tormos, F Barber
Inteligencia Artificial. Revista Iberoamericana de Inteligencia Artificial …, 2006
1042006
Robustness in railway transportation scheduling
MA Salido, F Barber, L Ingolotti
2008 7th World Congress on Intelligent Control and Automation, 2880-2885, 2008
962008
Rescheduling in job-shop problems for sustainable manufacturing systems
MA Salido, J Escamilla, F Barber, A Giret
Journal of cleaner production 162, S121-S132, 2017
852017
A decision support system for managing combinatorial problems in container terminals
MA Salido, M Rodriguez-Molins, F Barber
Knowledge-Based Systems 29, 63-74, 2012
682012
Robustness for a single railway line: Analytical and simulation methods
MA Salido, F Barber, L Ingolotti
Expert Systems with Applications 39 (18), 13305-13327, 2012
672012
Intelligent planning for allocating containers in maritime terminals
M Rodriguez-Molins, MA Salido, F Barber
Expert Systems with Applications 39 (1), 978-989, 2012
602012
A genetic algorithm for robust berth allocation and quay crane assignment
M Rodriguez-Molins, L Ingolotti, F Barber, MA Salido, MR Sierra, J Puente
Progress in Artificial Intelligence 2, 177-192, 2014
532014
A GRASP-based metaheuristic for the Berth Allocation Problem and the Quay Crane Assignment Problem by managing vessel cargo holds
M Rodriguez-Molins, MA Salido, F Barber
Applied intelligence 40, 273-290, 2014
502014
Integrated intelligent techniques for remarshaling and berthing in maritime terminals
MA Salido, M Rodriguez-Molins, F Barber
Advanced Engineering Informatics 25 (3), 435-451, 2011
492011
A metric time-point and duration-based temporal model
FA Barber
ACM Sigart Bulletin 4 (3), 30-49, 1993
441993
Survey of automated systems for railway management
F Barber, M Abril, MA Salido, L Ingolotti, P Tormos, A Lova
Technical Report, 2007
432007
A metaheuristic technique for energy-efficiency in job-shop scheduling
J Escamilla, MA Salido, A Giret, F Barber
The Knowledge Engineering Review 31 (5), 475-485, 2016
422016
Domain dependent distributed models for railway scheduling
MA Salidol, M Abril, F Barber, L Ingolotti, P Tormos, A Lova
Applications and Innovations in Intelligent Systems XIV: Proceedings of AI …, 2007
422007
Heuristic methods for solving job-shop scheduling problems
A Garrido, MA Salido, F Barber, M López
Proc. ECAI-2000 Workshop on New Results in Planning, Scheduling and Design …, 2000
422000
Reasoning on interval and point-based disjunctive metric constraints in temporal contexts
F Barber
Journal of Artificial Intelligence Research 12, 35-86, 2000
402000
Distributed CSPs by graph partitioning
MA Salido, F Barber
Applied Mathematics and Computation 183 (1), 491-498, 2006
372006
The system can't perform the operation now. Try again later.
Articles 1–20