Seguir
Yelda Turkan
Título
Citado por
Citado por
Año
The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components
F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas
Automation in Construction 49, 201-213, 2015
4992015
Automated progress tracking using 4D schedule and 3D sensing technologies
Y Turkan, F Bosche, CT Haas, R Haas
Automation in construction 22, 414-421, 2012
4462012
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system
F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas
Journal of computing in civil engineering 28 (4), 05014004, 2014
2332014
IFC BIM-based facility management approach to optimize data collection for corrective maintenance
F Shalabi, Y Turkan
Journal of performance of constructed facilities 31 (1), 04016081, 2017
1592017
Mobile augmented reality for teaching structural analysis
Y Turkan, R Radkowski, A Karabulut-Ilgu, AH Behzadan, A Chen
Advanced Engineering Informatics 34, 90-100, 2017
1572017
Toward automated earned value tracking using 3D imaging tools
Y Turkan, F Bosché, CT Haas, R Haas
Journal of construction engineering and management 139 (4), 423-433, 2013
1482013
A BIM-based simulation framework for fire safety management and investigation of the critical factors affecting human evacuation performance
Q Sun, Y Turkan
Advanced Engineering Informatics 44, 101093, 2020
1092020
Bridge construction progress monitoring using lidar and 4D design models
N Puri, Y Turkan
Automation in Construction 109, 102961, 2020
912020
Adaptive wavelet neural network for terrestrial laser scanner-based crack detection
Y Turkan, J Hong, S Laflamme, N Puri
Automation in construction 94, 191-202, 2018
802018
Tracking of secondary and temporary objects in structural concrete work
Y Turkan, FN Bosche, CT Haas, H Ralph
Construction Innovation: Information, Process, Management 14 (2), 2014
742014
System requirements for electrically conductive concrete heated pavements
H Abdualla, H Ceylan, S Kim, K Gopalakrishnan, PC Taylor, Y Turkan
Transportation Research Record 2569 (1), 70-79, 2016
632016
Lessons from using BIM to increase design-construction integration
GP Luth, A Schorer, Y Turkan
Practice periodical on structural design and construction 19 (1), 103-110, 2014
512014
Assessment of compliance of dimensional tolerances in concrete slabs using TLS data and the 2D continuous wavelet transform
N Puri, E Valero, Y Turkan, F Bosché
Automation in construction 94, 62-72, 2018
492018
BrIM and UAS for bridge inspections and management
Y Xu, Y Turkan
Engineering, Construction and Architectural Management 27 (3), 785-807, 2020
482020
Tracking secondary and temporary concrete construction objects using 3D imaging technologies
Y Turkan, F Bosché, CT Haas, R Haas
Computing in Civil Engineering (2013), 749-756, 2013
472013
Toward Automated Spatial Change Analysis of MEP Components using 3D Point Clouds and As-Designed BIM Models
VS Kalasapudi, Y Turkan, P Tang
2014 Workshop on 3D Computer Vision in the Built Environment, 2014
422014
Scan-to-BIM – An Overview of the Current State of the Art and a Look Ahead
H Son, C Kim, Y Turkan
2015 The International Symposium on Automation and Robotics in Construction …, 2015
392015
Civil integrated management: An emerging paradigm for civil infrastructure project delivery and management
F Guo, CT Jahren, Y Turkan, H David Jeong
Journal of Management in Engineering 33 (2), 04016044, 2017
382017
Electronic document management systems for the transportation construction industry
F Guo, CT Jahren, Y Turkan
International Journal of Construction Education and Research 17 (1), 52-67, 2021
352021
Bridge inspection using bridge information modeling (BrIM) and unmanned aerial system (UAS)
Y Xu, Y Turkan
Advances in Informatics and Computing in Civil and Construction Engineering …, 2019
342019
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20