Alejandro Enrique Martinez Castro
TitleCited byYear
Semi-analytic solution in the time domain for non-uniform multi-span Bernoulli–Euler beams traversed by moving loads
AE Martinez-Castro, P Museros, A Castillo-Linares
Journal of Sound and Vibration 294 (1-2), 278-297, 2006
662006
Singular boundary elements for three-dimensional elasticity problems
BB Guzina, RYS Pak, AE Martínez-Castro
Engineering analysis with boundary elements 30 (8), 623-639, 2006
302006
Efficient numerical model for the computation of impedance functions of inclined pile groups in layered soils
GM Álamo, AE Martínez-Castro, LA Padrón, JJ Aznárez, R Gallego, ...
Engineering Structures 126, 379-390, 2016
132016
Three-dimensional Green’s function for time-harmonic dynamics in a viscoelastic layer
AE Martínez-Castro, R Gallego
International journal of solids and structures 44 (13), 4541-4558, 2007
132007
Semi-Analytic Solution for Kirchhoff plates traversed by moving loads."
P Museros, AE Martínez-Castro, A Castillo-Linares, GI Schueller
Proc., 6th European Conf. on Structural Dynamics, 1619-1624, 2005
92005
Dynamic soil-structure interaction in offshore wind turbines on monopiles in layered seabed based on real data
GM Álamo, JJ Aznárez, LA Padrón, AE Martínez-Castro, R Gallego, ...
Ocean Engineering 156, 14-24, 2018
72018
Tangential residual as error estimator in the boundary element method
AE Martínez-Castro, R Gallego
Computers & structures 83 (10-11), 685-699, 2005
62005
Design goes up a gear
P Museros, A Martínez-Castro, A Castillo-Linares
Bridge. Design & Engineering 33, 42-43, 2003
52003
Sensitivity analysis of approximate solutions for the hypersingular boundary element method
R Gallego, AE Martínez-Castro, J Suárez
Proceedings of the Boundary Elements Techniques Conference. London: MH …, 1999
51999
Puente arco sobre la línea de alta velocidad Córdoba-Málaga. Condicionantes dinámicos y constructivos para el diseño
AMC A. Castillo, M. Villameriel, G. Montero, M. García, J. Moreno
Hormigón y Acero 61 (258), 25-42, 2010
4*2010
Importance of Using Accurate Soil Profiles for the Estimation of Pile Kinematic Input Factors
GM Álamo, JJ Aznárez, LA Padrón, AE Martínez-Castro, O Maeso
Journal of Geotechnical and Geoenvironmental Engineering 145 (8), 04019035, 2019
32019
A proposal for normalized impedance functions of inclined piles in non-homogeneous media
GM Álamo, AE Martínez-Castro, LA Padrón, JJ Aznárez, R Gallego, ...
Procedia engineering 199, 86-91, 2017
32017
Boundary integral equation for tangential derivative of flux in Laplace and Helmholtz equations
R Gallego, AE Martínez‐Castro
International journal for numerical methods in engineering 66 (2), 334-363, 2006
32006
Identification of cavities in a three-dimensional layer by minimization of an optimal cost functional expansion
AE Martínez-Castro, IH Faris, R Gallego
Computer Modeling in Engineering & Sciences(CMES) 87 (3), 177-206, 2012
22012
Dinámica de Puentes Arco Atirantados para el ferrocarril de alta velocidad: estudio de un caso, planteamiento de alternativas y conclusiones para el diseño
E García Macías
12012
Train-speed sensitivity approach for maximum response envelopes in dynamics of railway bridges
AE Martínez-Castro, E García-Macías
Journal of Sound and Vibration 452, 13-33, 2019
2019
An iterative parallel solver in GPU applied to frequency domain linear water wave problems by the Boundary Element Method
AE Martínez-Castro, JA Molina-Moya, P Ortiz
Frontiers in Built Environment 4, 69, 2018
2018
Exámenes con corrección automática para la mejora de los sistemas de evaluación (artículo de congreso)
A Martínez Castro
Indotec. V Jornadas internacionales sobre innovación docente en las …, 2017
2017
A proposal for normalized impedance functions of inclined piles in non-homogeneous media
GM Álamo Meneses, AE Martínez-Castro, LA Padrón Hernández, ...
2017
Análisis dinámico de puentes arco de hormigón para el ferrocarril de alta velocidad. Caso viaducto sobre el río tajo en el embalse de Alcántara
ME Rodríguez Mesa
2016
The system can't perform the operation now. Try again later.
Articles 1–20