Follow
Francisco Alberto Campos Fernández
Francisco Alberto Campos Fernández
Operations Researcher, Pontifical Comillas University, Madrid
Verified email at comillas.edu - Homepage
Title
Cited by
Cited by
Year
Optimal demand-side bidding strategies in electricity spot markets
R Herranz, AM San Roque, J Villar, FA Campos
IEEE Transactions on power systems 27 (3), 1204-1213, 2012
1602012
Joint energy and reserve markets: Current implementations and modeling trends
P González, J Villar, CA Díaz, FA Campos
Electric Power Systems Research 109, 101-111, 2014
1362014
Electricity market equilibrium based on conjectural variations
CA Díaz, J Villar, FA Campos, J Reneses
Electric power systems research 80 (12), 1572-1579, 2010
832010
Connecting the intraday energy and reserve markets by an optimal redispatch
J GarcÍa-GonzÁlez, AM San Roque, FA Campos, JÉ Villar
IEEE transactions on power systems 22 (4), 2220-2231, 2007
412007
Abnormal B cell function in haemophiliacs and their relationship with factor concentrates administration.
JA Brieva, J Sequi, JM Zabay, A Pardo, A Campos, ML de la Sen, ...
Clinical and experimental immunology 59 (2), 491, 1985
311985
Wind and solar integration with plug-in electric vehicles smart charging strategies
J Villar, CA Díaz, P González, FA Campos
11th International Conference on the European Energy Market (EEM14), 1-6, 2014
232014
Bi-level optimization of electricity tariffs and PV distributed generation investments
C Cervilla, J Villar, FA Campos
2015 12th International Conference on the European Energy Market (EEM), 1-5, 2015
222015
A new algorithm to compute conjectured supply function equilibrium in electricity markets
CA Díaz, J Villar, FA Campos, MÁ Rodríguez
Electric Power Systems Research 81 (2), 384-392, 2011
222011
SGO: Management information system for strategic bidding in electrical markets
J Villar, A Muñoz, EF Sánchez-Úbeda, A Mateo, M Casado, A Campos, ...
2001 IEEE Porto Power Tech Proceedings (Cat. No. 01EX502) 1, 6 pp. vol. 1, 2001
222001
Application of possibility theory to robust Cournot equilibrium in the electricity market
FA Campos, J Villar, J Barquin
Probability in the Engineering and Informational Sciences 19 (4), 519-531, 2005
182005
Endogenous computation of conjectured supply functions with network constraints
CA Díaz, FA Campos, J Villar, MÁ Rodríguez
Electric power systems research 90, 117-125, 2012
162012
Robust solutions using fuzzy chance constraints
F Alberto Campos, J Villar, M Jimenez
Engineering Optimization 38 (6), 627-645, 2006
162006
Energy and reserve co-optimization of a combined cycle plant using mixed integer linear programming
FA Campos, J Reneses
Journal of Engineering for Gas Turbines and Power 136 (10), 101702, 2014
122014
Existence and uniqueness of conjectured supply function equilibria
CA Díaz, FA Campos, J Villar
International Journal of Electrical Power & Energy Systems 58, 266-273, 2014
122014
Spanish secondary reserve requirements, clearing and usage
CA Díaz, P González, FA Campos, J Villar
11th International Conference on the European Energy Market (EEM14), 1-5, 2014
122014
Disorders of regulatory T cell function in patients with the Wiskott-Aldrich syndrome.
JM Zabay, G Fontán, A Campos, MC García-Rodriguez, ...
Clinical and experimental immunology 56 (1), 23, 1984
101984
Solving Cournot equilibriums with variational inequalities algorithms
FA Campos, J Villar, J Barquín
IET generation, transmission & distribution 4 (2), 268-280, 2010
82010
Endogenous secondary reserves requirements in long-term electricity generation models
FA Campos, S Doménech, J Villar
2017 14th International Conference on the European Energy Market (EEM), 1-5, 2017
72017
Variational inequalities for solving possibilistic risk-averse electricity market equilibrium
FA Campos, J Villar, J Barquin, J Reneses
IET generation, transmission & distribution 2 (5), 632-645, 2008
72008
A goal programming model for rescheduling of generation power in deregulated markets
E Centeno, B Vitoriano, A Campos, A Muñoz, J Villar, EF Sánchez-Úbeda
Annals of Operations Research 120, 45-57, 2003
72003
The system can't perform the operation now. Try again later.
Articles 1–20