Follow
Ömer Kırca
Ömer Kırca
Middle East Techical University
Verified email at metu.edu.tr
Title
Cited by
Cited by
Year
Selecting transfer station locations for large solid waste systems
Ö Kirca, N Erkip
European journal of operational research 35 (3), 339-349, 1988
1631988
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
A Tozkapan, Ö Kırca, CS Chung
Computers & Operations Research 30 (2), 309-320, 2003
1582003
Tardiness minimization on parallel machines
M Azizoglu, O Kirca
International Journal of Production Economics 55 (2), 163-168, 1998
1571998
A branch‐and‐bound‐based heuristic for solving the quadratic assignment problem
MS Bazaraa, O Kirca
Naval research logistics quarterly 30 (2), 287-304, 1983
1311983
A heuristic for obtaining and initial solution for the transportation problem
Ö Kirca, A Şatir
Journal of the Operational Research Society 41 (9), 865-871, 1990
1111990
On the minimization of total weighted flow time with identical and uniform parallel machines
M Azizoglu, O Kirca
European Journal of Operational Research 113 (1), 91-100, 1999
861999
A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems
CS Chung, J Flynn, O Kirca
International Journal of Production Economics 79 (3), 185-196, 2002
852002
A new heuristic approach for the multi-item dynamic lot sizing problem
Ö Kirca, M Kökten
European Journal of Operational Research 75 (2), 332-341, 1994
811994
Scheduling jobs on unrelated parallel machines to minimize regular total cost functions
M Azizoglu, O Kirca
IIE transactions 31 (2), 153-159, 1999
761999
A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems
CS Chung, J Flynn, Ö Kirca
European Journal of Operational Research 174 (1), 1-10, 2006
672006
Bicriteria scheduling problem involving total tardiness and total earliness penalties
M Azizoǧlu, S Kondakci, Ö Kirca
International Journal of Production Economics 23 (1-3), 17-24, 1991
621991
An integrated production and financial planning model and an application
Ö Kirca, MM Köksalan
IIE transactions 28 (8), 677-686, 1996
511996
A multi-item newsvendor problem with preseason production and capacitated reactive production
CS Chung, J Flynn, Ö Kirca
European Journal of Operational Research 188 (3), 775-792, 2008
482008
An efficient algorithm for the capacitated single item dynamic lot size problem
Ö Kirca
European Journal of Operational Research 45 (1), 15-24, 1990
471990
The coordinated replenishment dynamic lot-sizing problem with quantity discounts
CS Chung, SH Hum, O Kirca
European Journal of Operational Research 94 (1), 122-133, 1996
431996
A location-distribution application for a beer company
M Köksalan, H Süral, Ö Kirca
European Journal of Operational Research 80 (1), 16-24, 1995
411995
Flow shop-sequencing problem with synchronous transfers and makespan minimization
B Soylu, Ö Kirca, M Azizoğlu
International Journal of Production Research 45 (15), 3311-3331, 2007
362007
A primal‐dual algorithm for the dynamic lotsizing problem with joint set‐up costs
Ö Kirca
Naval Research Logistics (NRL) 42 (5), 791-806, 1995
341995
An efficient algorithm for the single machine tardiness problem
S Kondakci, Ö Kirca, M Azizoǧlu
International journal of production economics 36 (2), 213-219, 1994
291994
An optimal procedure for the coordinated replenishment dynamic lot‐sizing problem with quantity discounts
CS Chung, SH Hum, O Kirca
Naval Research Logistics (NRL) 47 (8), 686-695, 2000
242000
The system can't perform the operation now. Try again later.
Articles 1–20