Christopher Expósito-Izquierdo
Christopher Expósito-Izquierdo
Dirección de correo verificada de ull.edu.es
Título
Citado por
Citado por
Año
Maximizing the number of dual-cycle operations of quay cranes in container terminals
H Zhang, KH Kim
Computers & Industrial Engineering 56 (3), 979-992, 2009
1162009
Pre-marshalling problem: Heuristic solution method and instances generator
C Expósito-Izquierdo, B Melián-Batista, M Moreno-Vega
Expert Systems with Applications 39 (9), 8337-8349, 2012
972012
An improved formulation for the multi-depot open vehicle routing problem
E Lalla-Ruiz, C Expósito-Izquierdo, S Taheripour, S Voß
OR spectrum 38 (1), 175-187, 2016
562016
A two-level solution approach to solve the clustered capacitated vehicle routing problem
C Expósito-Izquierdo, A Rossi, M Sevaux
Computers & Industrial Engineering 91, 274-289, 2016
502016
A set-partitioning-based model for the berth allocation problem under time-dependent limitations
E Lalla-Ruiz, C Expósito-Izquierdo, B Melián-Batista, JM Moreno-Vega
European Journal of Operational Research 250 (3), 1001-1012, 2016
382016
An exact approach for the blocks relocation problem
C Expósito-Izquierdo, B Melián-Batista, JM Moreno-Vega
Expert Systems with Applications 42 (17-18), 6408-6422, 2015
382015
A domain-specific knowledge-based heuristic for the blocks relocation problem
C Expósito-Izquierdo, B Melián-Batista, JM Moreno-Vega
Advanced Engineering Informatics 28 (4), 327-343, 2014
382014
Hybrid estimation of distribution algorithm for the quay crane scheduling problem
C ExpóSito-Izquierdo, JL GonzáLez-Velarde, B Melián-Batista, ...
Applied Soft Computing 13 (10), 4063-4076, 2013
312013
A hybrid GRASP-VNS for ship routing and scheduling problem with discretized time windows
J de Armas, E Lalla-Ruiz, C Expósito-Izquierdo, D Landa-Silva, ...
Engineering Applications of Artificial Intelligence 45, 350-360, 2015
262015
A POPMUSIC-based approach for the berth allocation problem under time-dependent limitations
E Lalla-Ruiz, S Voß, C Expósito-Izquierdo, B Melián-Batista, ...
Annals of operations research 253 (2), 871-897, 2017
152017
Mobility as a Service
C Expósito-Izquierdo, A Expósito-Márquez, J Brito-Santana
Smart Cities: Foundations, Principles, and Applications. Hoboken, NJ: John …, 2017
142017
A hybrid biased random key genetic algorithm for the quadratic assignment problem
E Lalla-Ruiz, C Exposito-Izquierdo, B Melián-Batista, JM Moreno-Vega
Information processing letters 116 (8), 513-520, 2016
132016
Estimation of distribution algorithm for the quay crane scheduling problem
CE Izquierdo, JLG Velarde, BM Batista, JM Moreno-Vega
Nature Inspired Cooperative Strategies for Optimization (NICSO 2011), 183-194, 2011
122011
A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem
C Expósito-Izquierdo, F Angel-Bello, B Melián-Batista, A Alvarez, S Báez
Expert Systems with Applications 117, 62-74, 2019
92019
Minimizing the Waiting Times of block retrieval operations in stacking facilities
I López-Plata, C Expósito-Izquierdo, E Lalla-Ruiz, B Melián-Batista, ...
Computers & Industrial Engineering 103, 70-84, 2017
82017
Modeling and solving the clustered capacitated vehicle routing problem
CE Izquierdo, A Rossi, M Sevaux
Proceedings of the 14th EU/ME Workshop, 110-115, 2013
82013
Migrating birds optimization for the seaside problems at maritime container terminals
E Lalla-Ruiz, C Expósito-Izquierdo, J De Armas, B Melián-Batista, ...
Journal of Applied Mathematics 2015, 2015
72015
A heuristic algorithm based on an improvement strategy to exploit idle time periods for the stacking problem
C Expósito-Izquierdo, E Lalla-Ruiz, J de Armas, B Melián-Batista, ...
Computers & Industrial Engineering 87, 410-424, 2015
72015
An Estimation of Distribution Algorithm for Solving the Quay Crane Scheduling Problem with Availability Constraints.
CE Izquierdo, B Melián-Batista, JM Moreno-Vega
KES, 10-19, 2012
72012
Variable neighbourhood search for the quay crane scheduling problem
C Expósito-Izquierdo, B Melián-Batista, JM Moreno-Vega
2011 11th International Conference on Intelligent Systems Design and …, 2011
72011
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20