Roberto Macchiaroli
Roberto Macchiaroli
Dipartimento di Ingegneria Industriale e dell'Informazione, Università della Campania Luigi Vanvitelli
Dirección de correo verificada de unina2.it
Título
Citado por
Citado por
Año
A negotiation scheme for autonomous agents in job shop scheduling
R Macchiaroli, S Riemma
International Journal of Computer Integrated Manufacturing 15 (3), 222-232, 2002
662002
Appraisal of a new risk assessment model for SME
M Fera, R Macchiaroli
Safety science 48 (10), 1361-1368, 2010
612010
Timing of control activities in project planning
M de Falco, R Macchiaroli
International Journal of Project Management 16 (1), 51-58, 1998
531998
The role of uncertainty in supply chains under dynamic modeling
M Fera, F Fruggiero, A Lambiase, R Macchiaroli, S Miranda
International Journal of Industrial Engineering Computations 8 (1), 119-140, 2017
452017
Modelling and optimization of industrial manufacturing processes subject to no-wait constraints
R Macchiaroli, S Mole, S Riemma
International Journal of Production Research 37 (11), 2585-2607, 1999
361999
Economic evaluation model for the energy Demand Response
M Fera, R Macchiaroli, R Iannone, S Miranda, S Riemma
Energy 112, 457-468, 2016
332016
A new perspective for production process analysis using additive manufacturing—complexity vs production volume
M Fera, R Macchiaroli, F Fruggiero, A Lambiase
The International Journal of Advanced Manufacturing Technology 95 (1-4), 673-685, 2018
252018
State of the art of additive manufacturing: Review for tolerances, mechanical resistance and production costs
M Fera, F Fruggiero, A Lambiase, R Macchiaroli
Cogent Engineering 3 (1), 1261503, 2016
242016
Use of analytic hierarchy process and fire dynamics simulator to assess the fire protection systems in a tunnel on fire
M Fera, R Macchiaroli
International Journal of Risk Assessment and Management 14 (6), 504-529, 2010
242010
A modified genetic algorithm for time and cost optimization of an additive manufacturing single-machine scheduling
M Fera, F Fruggiero, A Lambiase, R Macchiaroli, V Todisco
International Journal of Industrial Engineering Computations 9 (4), 423-438, 2018
192018
Incorporating the human factor within manufacturing dynamics
F Fruggiero, S Riemma, Y Ouazene, R Macchiaroli, V Guglielmi
IFAC-PapersOnLine 49 (12), 1691-1696, 2016
192016
Digital twins to enhance the integration of ergonomics in the workplace design
F Caputo, A Greco, M Fera, R Macchiaroli
International Journal of Industrial Ergonomics 71, 20-31, 2019
172019
Project appraisal for small and medium size wind energy installation: The Italian wind energy policy effects
M Fera, R Iannone, R Macchiaroli, S Miranda, MM Schiraldi
Energy Policy 74, 621-631, 2014
172014
Clustering algorithms to optimize the tool handling system management in an FMS
R Macchiaroli, S Riemma
International journal of flexible manufacturing systems 8 (2), 183-201, 1996
171996
Clustering methods for production planning and scheduling in a flexible manufacturing system
R Macchiaroli, S Riemma
Proceedings of the 1994 IEEE International Conference on Robotics and …, 1994
151994
Proposal of a quali-quantitative assessment model for health and safety in small and medium enterprises
M Fera, R Macchiaroli
WIT Transactions on the Built Environment 108, 117-126, 2009
142009
Proposal of a quali-quantitative assessment model for health and safety in small and medium enterprises
M Fera, R Macchiaroli
WIT Transactions on the Built Environment 108, 117-126, 2009
142009
Application of a business process model (BPM) method for a warehouse RFId system implementation
M Fera, R Macchiaroli, F Fruggiero, A Lambiase, S Miranda
International Journal of RF Technologies 8 (1-2), 57-77, 2017
122017
Design of a tool management system in a flexible cell
R Macchiaroli, S Riemma
International journal of production research 34 (3), 767-784, 1996
121996
Design and implementation of a tabu search algorithm to solve the no-wait job-shop scheduling problem
R Macchiaroli, S Molè, S Riemma, L Trifiletti
Symposium on discrete events and manufacturing systems (Lille, July 9-12 …, 1996
101996
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20