Follow
Hamed Kazemipoor
Hamed Kazemipoor
Azad University, Central Tehran Branch
Verified email at iauctb.ac.ir
Title
Cited by
Cited by
Year
A fuzzy inference-fuzzy analytic hierarchy process-based clinical decision support system for diagnosis of heart diseases
S Nazari, M Fallah, H Kazemipoor, A Salehipour
Expert Systems with Applications 95, 261-271, 2018
1512018
A green multi-objective integrated scheduling of production and distribution with heterogeneous fleet vehicle routing and time windows
M Ganji, H Kazemipoor, SMH Molana, SM Sajadi
Journal of Cleaner Production 259, 120824, 2020
1002020
Big data analysis of IoT-based supply chain management considering FMCG industries
H Nozari, M Fallah, H Kazemipoor, SE Najafi
Бизнес-информатика 15 (1 (eng)), 78-96, 2021
872021
A differential evolution algorithm to solve multi-skilled project portfolio scheduling problems
H Kazemipoor, R Tavakkoli-Moghaddam, P Shahnazari-Shahrezaei, ...
The International Journal of Advanced Manufacturing Technology 64, 1099-1111, 2013
642013
Solving a multi-objective multi-skilled manpower scheduling model by a fuzzy goal programming approach
P Shahnazari-Shahrezaei, R Tavakkoli-Moghaddam, H Kazemipoor
Applied Mathematical Modelling 37 (7), 5424-5443, 2013
572013
Fuzzy decision analysis for project scope change management
F Shirazi, H Kazemipoor, R Tavakkoli-Moghaddam
Decision Science Letters 6 (4), 395-406, 2017
422017
Scheduling aircraft landings by applying a variable neighborhood descent algorithm: Runway-dependent landing time case
A Salehipour, LM Naeni, H Kazemipoor
Journal of Applied Operational Research 1 (1), 39-49, 2009
322009
Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search
P Shahnazari-Shahrezaei, R Tavakkoli-Moghaddam, H Kazemipoor
The International Journal of Advanced Manufacturing Technology 64, 1517-1540, 2013
292013
Solving a novel multi-skilled project scheduling model by scatter search
H Kazemipoor, P Shahnazari-Shahrezaei, R Tavakkoli-Moghaddam
South African Journal of Industrial Engineering 24 (1), 121-135, 2013
242013
Locating workstations in tandem automated guided vehicle systems
A Salehipour, H Kazemipoor, L Moslemi Naeini
The International Journal of Advanced Manufacturing Technology 52, 321-328, 2011
222011
Partitioning machines in tandem AGV systems based on “balanced flow strategy” by simulated annealing
R Tavakkoli-Moghaddam, MB Aryanezhad, H Kazemipoor, A Salehipour
The international journal of advanced manufacturing technology 38, 355-366, 2008
212008
A neutrosophical model for optimal sustainable closed-loop supply chain network with considering inflation and carbon emission policies
S Kalantari, H Kazemipoor, FM Sobhani, SMH Molana
Decision Making: Applications in Management and Engineering 5 (2), 46-77, 2022
202022
Solving fully fuzzy linear programming with symmetric trapezoidal fuzzy numbers using Mehar’s method
A Hatami, H Kazemipoor
J. Math. Comput. Sci. 4 (2), 463-470, 2014
192014
Multi-depot electric vehicle routing problem with fuzzy time windows and pickup/delivery constraints
A Ghobadi, R Tavakkoli Moghadam, M Fallah, H Kazemipoor
Journal of applied research on industrial engineering 8 (1), 1-18, 2021
182021
The minimum latency in location routing fuzzy inventory problem for perishable multi-product materials
S Daroudi, H Kazemipoor, E Najafi, M Fallah
Applied Soft Computing 110, 107543, 2021
162021
Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing
H Kazemipoor, R Tavakkoli-Moghaddam, P Shahnazari-Shahrezaei
Management Science Letters 2 (2), 681-688, 2002
162002
A new multi objective mathematical model for relief distribution location at natural disaster response phase
ME Sadeghi, M Khodabakhsh, MR Ganjipoor, H Kazemipoor, H Nozari
arXiv preprint arXiv:2108.05458, 2021
152021
Designing sustainable closed-loop supply chain network with considering spot-to-point inflation and carbon emission policies: A case study
S Kalantari, H Kazemipoor, FM Sobhani, SMH Molana
Computers & Industrial Engineering 174, 108748, 2022
102022
Solving fuzzy robust facility layout problem equipped with cranes using MPS algorithm and modified NSGA-II
S Esmikhani, H Kazemipoor, FM Sobhani, SMH Molana
Expert Systems with Applications 210, 118402, 2022
92022
Proposing a model for the selection of repair & maintenance strategy for it systems with the help of dematel & ANP fuzzy process
M Dorri, H Kazemipour, MM Peydae
Arabian Journal of Business and Management Review (Kuwait Chapter) 3 (6 …, 2014
92014
The system can't perform the operation now. Try again later.
Articles 1–20