Seguir
Cemalettin Öztürk
Cemalettin Öztürk
Munster Technological University
Dirección de correo verificada de mtu.ie - Página principal
Título
Citado por
Citado por
Año
Empowering and engaging industrial workers with Operator 4.0 solutions
E Kaasinen, F Schmalfuß, C Özturk, S Aromaa, M Boubekeur, J Heilala, ...
Computers & Industrial Engineering 139, 105678, 2020
1722020
Object detection at 200 frames per second
R Mehta, C Ozturk
Proceedings of the European Conference on Computer Vision (ECCV) Workshops, 0-0, 2018
462018
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunali, B Hnich, A Ornek
Journal of Manufacturing Systems 36, 147-158, 2015
382015
Balancing and scheduling of flexible mixed model assembly lines
C Ozturk, S Tunali, B Hnich, MA Ornek
Constraints 18 (3), 434-469, 2013
382013
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
302010
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
272010
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
262014
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67 (9), 2577-2591, 2013
232013
Moreopt: A goal programming based movie recommender system
E Inan, F Tekbacak, C Ozturk
Journal of computational science 28, 43-50, 2018
222018
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
182016
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
172012
User evaluation of industry 4.0 concepts for worker engagement
S Aromaa, M Liinasuo, E Kaasinen, M Bojko, F Schmalfuß, ...
International conference on human systems engineering and design: Future …, 2018
152018
STTAR: a simheuristics-enabled scheme for multi-stakeholder coordination of aircraft turnaround operations
M Tomasella, A Clare, YS Gök, D Guimarans, C Ozturk
2019 Winter Simulation Conference (WSC), 488-499, 2019
132019
A note on “A mixed integer programming model for advanced planning and scheduling (APS)”
A Örnek, S Özpeynirci, C Öztürk
European Journal of Operational Research 203 (3), 784-785, 2010
132010
Integer and constraint programming model formulations for flight-gate assignment problem
MA Ornek, C Ozturk, I Sugut
Operational Research, 1-29, 2020
92020
Designing an Optical Island in the Core Network: From Routing to Spectrum Allocation
D Mehta, B OSullivan, C Ozturk, L Quesada, H Simonis
Tools with Artificial Intelligence (ICTAI), 2014 IEEE 26th International …, 2014
72014
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Ozturk, S Tunali, B Hnich, A Ornek
International Journal of Advanced Manufacturing Technology 67 (9-12), 2577-2591, 2013
72013
A simheuristic approach for robust scheduling of airport turnaround teams
YS Gök, M Tomasella, D Guimarans, C Ozturk
2020 Winter Simulation Conference (WSC), 1336-1347, 2020
62020
A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, MA Örnek
IFAC Proceedings Volumes 45 (6), 420-425, 2012
62012
Model-based heuristic for counter assignment problem with operational constrains: A case study
MA Ornek, C Ozturk, I Sugut
Journal of Air Transport Management 77, 57-64, 2019
52019
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20