Variations of the kanban system: Literature review and classification ML Junior, M Godinho Filho International Journal of Production Economics 125 (1), 13-21, 2010 | 618 | 2010 |
MG Filho. 2010.“Variations of the Kanban System: Literature Review and Classification.” ML Junior International Journal of Production Economics 125 (1), 13-21, 0 | 618 | |
Production planning and control for remanufacturing: literature review and analysis M Lage Junior, M Godinho Filho Production Planning & Control 23 (6), 419-435, 2012 | 170 | 2012 |
Production planning and control for remanufacturing: literature review and analysis ML Junior, MG Filho Production Planning & Control 23 (6), 419-435, 2012 | 126 | 2012 |
Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies ML Junior, M Godinho Filho Production Planning and Control 27 (3), 212-225, 2016 | 81 | 2016 |
Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs PB Macedo, D Alem, M Santos, ML Junior, A Moreno The International Journal of Advanced Manufacturing Technology 82 (5-8 …, 2016 | 60 | 2016 |
Adaptações ao sistema kanban: revisão, classificação, análise e avaliação M Lage Junior, M Godinho Filho Gestão & Produção 15 (1), 173-188, 2008 | 44 | 2008 |
Production planning and control for remanufacturing: exploring characteristics and difficulties with case studies M Lage Junior, M Godinho Filho Production Planning & Control 27 (3), 212-225, 2016 | 34 | 2016 |
Master disassembly scheduling in a remanufacturing system with stochastic routings ML Junior, M Godinho Filho Central European Journal of Operations Research 25 (1), 123-138, 2017 | 29 | 2017 |
Evolução e avaliação da utilização do sistema kanban em empresas paulistas ML Junior, M Godinho Filho Revista de Administração-RAUSP 44 (4), 380-395, 2009 | 6 | 2009 |
Adaptations of the kanban system: review, classification, analysis and evaluation M Lage Junior, M Godinho Filho Gestão & Produção 15 (1), 173-188, 2008 | 6 | 2008 |
Lead time reduction in a capital goods company by means of the implementation of Period Batch Control system MR Severino, M Lage Junior, L Campanini, AA Guimarães, ... Production 20 (4), 0-0, 2010 | 5* | 2010 |
Proposta de utilização do sistema Period Batch Control para redução de lead time em uma empresa de bens de capital MR Severino, M Lage Junior, L Campanini, AA Guimarães, ... Produção 20 (4), 2010 | 5 | 2010 |
Evolução e avaliação da utilização do sistema kanban e de suas adaptações: survey e estudos de caso. M Lage Junior Universidade Federal de São Carlos, 2007 | 3 | 2007 |
PROPOSIÇÃO DE UM JOGO DIDÁTICO PARA O ENSINO-APRENDIZAGEM DAS DIFERENÇAS ENTRE MANUFATURA E REMANUFATURA ML Junior | 2* | |
MG Filho ML Junior Production planning and control for remanufacturing: literature review and …, 2012 | | 2012 |
Proposta de um modelo de programa mestre de desmontagem de produtos em um sistema de remanufatura com roteiros estocásticos M Lage Junior Universidade Federal de São Carlos, 2012 | | 2012 |
Evolução e avaliação da utilização do sistema kanban e de suas adaptações: survey e estudos de caso. ML Junior Biblioteca Digital de Teses e Dissertações da Universidade Federal de São Carlos, 2010 | | 2010 |
PLANEJAMENTO E CONTROLE DA PRODUÇÃO (PCP) NA REMANUFATURA: ANÁLISE ESTRATÉGICA POR MEIO DE UM ESTUDO TEÓRICO PRODUCTION PLANNING AND CONTROL (PPC) FOR REMANUFACTURING … ML Junior, MG Filho | | |