M Arslan Ornek
M Arslan Ornek
Verified email at yasar.edu.tr
Title
Cited by
Cited by
Year
A simulation based experimental design to analyze factors affecting production flow time
BY Ekren, AM Ornek
Simulation Modelling Practice and Theory 16 (3), 278-293, 2008
702008
Simulation analysis of lot streaming in job shops with transportation queue disciplines
RS Edis, A Ornek
Simulation Modelling Practice and Theory 17 (2), 442-453, 2009
372009
Balancing and scheduling of flexible mixed model assembly lines
C Öztürk, S Tunalı, B Hnich, MA Örnek
Constraints 18 (3), 434-469, 2013
352013
A vehicle scheduling problem with fixed trips and time limitations
DT Eliiyi, A Ornek, SS Karakütük
International Journal of Production Economics 117 (1), 150-161, 2009
342009
Cyclic scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
Journal of Manufacturing Systems 36, 147-158, 2015
282015
Simultaneous balancing and scheduling of flexible mixed model assembly lines with sequence-dependent setup times
C Ozturk, S Tunali, B Hnich, AM Ornek
Electronic Notes in Discrete Mathematics 36, 65-72, 2010
282010
Capacitated lot sizing with linked lots for general product structures in job shops
C Oztürk, AM Ornek
Computers & Industrial Engineering 58 (1), 151-164, 2010
272010
A tabu search-based heuristic for single-product lot streaming problems in flow shops
RS Edis, MA Ornek
The International Journal of Advanced Manufacturing Technology 43 (11), 1202 …, 2009
252009
Capacitated lot sizing with alternative routings and overtime decisions
AM Ornek, O Cengiz
International Journal of Production Research 44 (24), 5363-5389, 2006
252006
Operational extended model formulations for advanced planning and scheduling systems
C Öztürk, AM Ornek
Applied Mathematical Modelling 38 (1), 181-195, 2014
232014
Balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, A Örnek
The International Journal of Advanced Manufacturing Technology 67 (9-12 …, 2013
222013
An improved metric for measuring multi-item multi-level schedule instability under rolling schedules
KE Kabak, AM Ornek
Computers & Industrial Engineering 56 (2), 691-707, 2009
182009
The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems
MA Ornek, PI Collier
International Journal of Operations & Production Management, 1988
181988
OPTIMISATION AND CONSTRAINT BASED HEURISTIC METHODS FOR ADVANCED PLANNING AND SCHEDULING SYSTEMS.
C Ozturk, MA Ornek
International Journal of Industrial Engineering 23 (1), 2016
152016
A MIP based heuristic for capacitated MRP systems
C Öztürk, AM Örnek
Computers & Industrial Engineering 63 (4), 926-942, 2012
142012
A note on “A mixed integer programming model for advanced planning and scheduling (APS)”
A Örnek, S Özpeynirci, C Öztürk
European journal of operational research 203 (3), 784-785, 2010
122010
Determining optimum (s, S) levels of floor stock items in a paint production environment
BY Ekren, MA Ornek
Simulation Modelling Practice and Theory 57, 133-141, 2015
102015
A mathematical model for energy and in-process inventory assessment in a manufacturing system
PI Collier, A Ornek
Applied Energy 13 (4), 265-280, 1983
91983
A constraint programming model for balancing and scheduling of flexible mixed model assembly lines with parallel stations
C Öztürk, S Tunalı, B Hnich, MA Örnek
IFAC Proceedings Volumes 45 (6), 420-425, 2012
62012
Simulation-based inventory control in a chemical industry
BY EKREN, MA ORNEK
Industrial Engineering Applications in Emerging Countries, 67, 2014
52014
The system can't perform the operation now. Try again later.
Articles 1–20