Omar Jorge Ibarra-Rojas
Omar Jorge Ibarra-Rojas
Autonomous University of Nuevo Leon
Dirección de correo verificada de uanl.edu.mx
Título
Citado por
Citado por
Año
Planning, operation, and control of bus transport systems: A literature review
OJ Ibarra-Rojas, F Delgado, R Giesen, JC Muñoz
Transportation Research Part B: Methodological 77, 38-75, 2015
3162015
Synchronization of bus timetabling
OJ Ibarra-Rojas, YA Rios-Solis
Transportation Research Part B: Methodological 46 (5), 599-614, 2012
1802012
An integrated approach for timetabling and vehicle scheduling problems to analyze the trade-off between level of service and operating costs of transit networks
OJ Ibarra-Rojas, R Giesen, YA Rios-Solis
Transportation Research Part B: Methodological 70, 35-46, 2014
752014
Multiperiod bus timetabling
OJ Ibarra-Rojas, F López-Irarragorri, YA Rios-Solis
Transportation Science 50 (3), 805-822, 2016
422016
Valid inequalities for the synchronization bus timetabling problem
P Fouilhoux, OJ Ibarra-Rojas, S Kedad-Sidhoum, YA Rios-Solis
European Journal of Operational Research 251 (2), 442-450, 2016
202016
Vehicle and Crew Scheduling for Flexible Bus Transportation Systems
V Boyer, OJ Ibarra-Rojas, YA Ríos-Solís
Transportation Research B 112, 216-229, 2018
132018
Synchronizing different transit lines at common stops considering travel time variability along the day
OJ Ibarra-Rojas, JC Muñoz
Transportmetrica A: Transport Science 12 (8), 751-769, 2016
112016
A decomposition approach for the piece–mold–machine manufacturing problem
OJ Ibarra-Rojas, RZ Ríos-Mercado, YA Rios-Solis, MA Saucedo-Espinosa
International Journal of Production Economics 134 (1), 255-261, 2011
112011
The Accessibility Vehicle Routing Problem
OJ Ibarra-Rojas, L Hernandez, L Ozuna
Journal of Cleaner Production 172, 1514-1528, 2018
72018
Piece-mold-machine manufacturing planning
OJ Ibarra-Rojas, YA Rios-Solis, OL Chacon-Mondragon
Intelligent Systems in Operations: Methods, Models and Applications in the …, 2010
72010
Programación pieza-molde-máquina en planeación de la producción
OL Chacón Mondragón, OJ Ibarra Rojas, YA Ríos Solís, ...
Ciencia UANL 15 (58), 59-65, 2012
52012
Integrating synchronization bus timetabling and single-depot single-type vehicle scheduling
OJ Ibarra-Rojas, YA Rios-Solis
ORP3 Meeting, Cadiz, 2011
52011
An integrated approach for the rectangular delineation of management zones and the crop planning problems
OJIR Nestor Cid-Garcia
Computers and Electronics in Agriculture 164, 2019
22019
A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production
EP Y.A. Rios-Solis, O.J. Ibarra-Rojas, M. Cabo
European Journal of Operational Research, 2020
12020
Diseño de horarios para sincronizar líneas de buses en múltiples periodos de planificación
OJ Ibarra-Rojas, YA Rios-Solis
Congreso Chileno de Ingeniería de Transporte, 2013
12013
Models and algorithms for transit network planning
OJ Ibarra Rojas
Universidad Autónoma de Nuevo León, 2012
12012
Scheduling synchronized public transport systems considering holding times and demand assignment
JC Munoz, R Giesen, P Knapp, OJ Ibarra-Rojas
1
The maximal covering location problem with accessibility indicators
OJ Ibarra-Rojas, L Ozuna, D López-Piñón
Socio-Economic Planning Sciences, 100758, 2019
2019
Integrating Frequency Setting, Timetabling, and Route Assignment to Synchronize Transit Lines
OJ Ibarra-Rojas, JC Muñoz, R Giesen, P Knapp
Journal of Advanced Transportation 2019, 2019
2019
ARTICLE TEMPLATE
YI Silva-Soto, OJ Ibarra-Rojas
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20