FILOSOFÍA LEAN CONSTRUCTION PARA LA GESTIÓN DE PROYECTOS DE CONSTRUCCIÓN: UNA REVISIÓN ACTUAL H Porras, O Sánchez, J Galvis AVANCES Investigación en Ingeniería 11 (1), 32-53, 2014 | 246* | 2014 |
Cost overrun causative factors in road infrastructure projects: A frequency and importance analysis RF Herrera, O Sánchez, K Castañeda, H Porras Applied Sciences 10 (16), 5506, 2020 | 85 | 2020 |
Tecnologías" Building Information Modeling" en la elaboración de presupuestos de construcción de estructuras en concreto reforzado H Porras-Díaz, OG Sánchez-Rivera, JA Galvis-Guerra, NA Jaimez-Plata, ... Entramado 11 (1), 230-249, 2015 | 49* | 2015 |
BIM-based traffic analysis and simulation at road intersection design K Castañeda, O Sánchez, RF Herrera, E Pellicer, H Porras Automation in Construction 131, 103911, 2021 | 45 | 2021 |
Highway planning trends: a bibliometric analysis K Castañeda, O Sánchez, RF Herrera, G Mejía Sustainability 14 (9), 5544, 2022 | 33 | 2022 |
Planificación de recursos humanos a partir de la simulación del proceso constructivo en modelos BIM 5D JJ Bohórquez-Castellanos, H Porras-Díaz, OG Sánchez-Rivera, ... Entramado 14 (1), 252-267, 2018 | 33 | 2018 |
Metodología para la elaboración de modelos del proceso constructivo 5d con tecnologías “building information modeling” HP Díaz, OGS Rivera, JAG Guerra Revista Gti 14 (38), 59-73, 2015 | 27 | 2015 |
Delay causes in road infrastructure projects in developing countries G Mejía, O Sánchez, K Castañeda, E Pellicer Revista de la Construcción 19 (2), 220-234, 2020 | 25 | 2020 |
ßrIM 5D models and Lean Construction for planning work activities in reinforced concrete bridges OG Sánchez-Rivera, JA Galvis-Guerra, H Porras-Díaz, YD Ardila-Chacón, ... Revista Facultad de Ingeniería 26 (46), 39-50, 2017 | 19* | 2017 |
Planificación del flujo de caja de proyectos de construcción basada en BIM y dinámica de sistemas KM Castañeda-Parra, OG Sánchez-Rivera, H Porras-Díaz Entramado 17 (1), 272-288, 2021 | 18* | 2021 |
Delay factors: A comparative analysis between road infrastructure and building projects O Sánchez, K Castañeda, G Mejía, E Pellicer Construction Research Congress 2020, 223-231, 2020 | 8 | 2020 |
Benefits of Last Planner® System in mitigation of delay causes in road infrastructure projects OG Sánchez, KM Castañeda, RF Herrera, E Pellicer SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO 11, 1-8, 2019 | 7 | 2019 |
Benefits of Building Information Modeling in Road Projects for Cost Overrun Factors Mitigation O Sánchez, K Castañeda, RF Herrera, E Pellicer Construction Research Congress 2022, 472-482, 2022 | 5 | 2022 |
Paper Planes for Teaching Construction Production Systems Based on Lean Tools: Continuous Improvement Cells and 5S O Sánchez, MP Revuelta, A Gómez-Cabrera, LA Salazar Buildings 13 (2), 558, 2023 | 4 | 2023 |
Cost deviation causes in Colombian construction projects: a frequency and severity analysis O Sánchez, K Castañeda, RF Herrera, E Pellicer, L Almanza, R Cadavid 2021 congreso internacional de innovación y tendencias en ingeniería …, 2021 | 3 | 2021 |
Digitalization and Sustainability in Linear Projects Trends: A Bibliometric Analysis NE Lozano-Ramírez, O Sánchez, D Carrasco-Beltrán, S Vidal-Méndez, ... Sustainability 15 (22), 15962, 2023 | 2 | 2023 |
Value generation analysis within the design process of construction projects in Chile Z Giménez, RF Herrera, O Sánchez Ain Shams Engineering Journal 15 (1), 102332, 2024 | 1 | 2024 |
Building Information Modeling and Complementary Technologies in Heritage Buildings: A Bibliometric Analysis A Puerto, K Castañeda, O Sánchez, CA Peña, L Gutiérrez, P Sáenz Results in Engineering, 102192, 2024 | | 2024 |
Exploring the Influence of Construction Companies Characteristics on Their Response to the COVID-19 Pandemic in the Chilean Context F Araya, P Poblete, LA Salazar, O Sánchez, L Sierra-Varela, Á Filun Sustainability 16 (8), 3417, 2024 | | 2024 |
Exploring Perceptions toward Emotional Intelligence in Chilean Construction Using a Qualitative Approach P Páez, F Araya, LA Salazar, Z Giménez, O Sánchez, L Sierra-Varela, ... Buildings 14 (4), 905, 2024 | | 2024 |