A hybrid genetic algorithm for the job shop scheduling problem JF Gonçalves, JJ de Magalhães Mendes, MGC Resende European journal of operational research 167 (1), 77-95, 2005 | 879 | 2005 |
A genetic algorithm for the resource constrained multi-project scheduling problem JF Gonçalves, JJM Mendes, MGC Resende European journal of operational research 189 (3), 1171-1190, 2008 | 522 | 2008 |
A random key based genetic algorithm for the resource constrained project scheduling problem JJM Mendes, JF Gonçalves, MGC Resende Computers & Operations Research 36 (1), 92-109, 2009 | 342 | 2009 |
A comparative study of crossover operators for genetic algorithms to solve the job shop scheduling problem J Magalhaes-Mendes WSEAS transactions on computers 12 (4), 164-173, 2013 | 185 | 2013 |
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem JF Gonçalves, MGC Resende, JJM Mendes Journal of Heuristics 17 (5), 467-486, 2011 | 135 | 2011 |
Evolutionary algorithms and metaheuristics: applications in engineering design and optimization D Greiner, J Periaux, D Quagliarella, J Magalhaes-Mendes, B Galván Mathematical Problems in Engineering 2018, 2018 | 36 | 2018 |
Sistema de apoio à decisão para planeamento de sistemas de produção tipo projecto J Magalhães Mendes Faculdade de Engenharia da Universidade do Porto, 2003 | 27* | 2003 |
Project scheduling under multiple resources constraints using a genetic algorithm J Magalhães-Mendes WSEAS Transactions on Business and Economics 5 (11), 487-496, 2008 | 25 | 2008 |
A Two-level Genetic Algorithm for the Multi-Mode Resource-Constrained Project Scheduling Problem J Magalhães-Mendes International Journal of Systems Applications, Engineering & Development …, 2011 | 24 | 2011 |
The Basic Multi-Project Scheduling Problem JF Goncalves, J Magalhães-Mendes, MGC Mauricio Handbook on Project Management and Scheduling - Chapter 31 2, 667-684, 2015 | 21 | 2015 |
Evolutionary Algorithms and Metaheuristics in Civil Engineering and Construction Management J Magalhaes-Mendes, D Greiner Computational Methods in Applied Sciences, Springer, 2015 | 19 | 2015 |
EVOLUTIONARY ALGORITHMS AND METAHEURISTICS IN CIVIL ENGINEERING AND CONSTRUCTION MANAGEMENT J MAGALHAES-MENDES, D GREINER 11th. World Congress on Computational Mechanics (WCCM2014), 2014 | 19 | 2014 |
Active, Parameterized Active, and Non-Delay Schedules for Project Scheduling with Multi-Modes J MAGALHÃES-MENDES Proceedings of the 16th WSEAS International Conference on APPLIED …, 2011 | 10 | 2011 |
Project scheduling using a competitive genetic algorithm J Magalhães-Mendes Proceedings of the 8th Conference on Simulation, Modelling and Optimization …, 2008 | 10 | 2008 |
A hybrid genetic algorithm for the multi-mode resource-constrained project scheduling J Magalhaes-Mendes 6th European Congress on Computational Methods in Applied Sciences and …, 2012 | 7 | 2012 |
A genetic algorithm for the job shop scheduling with a new local search using Monte Carlo method J Magalhães-Mendes Proceedings of the 10th WSEAS international conference on Artificial …, 2011 | 7 | 2011 |
Time-matters: Temporal unfolding of texts R Campos, J Duque, T Cândido, J Mendes, G Dias, A Jorge, C Nunes Advances in Information Retrieval: 43rd European Conference on IR Research …, 2021 | 6 | 2021 |
Multiobjective Genetic Algorithm-Based for Time-Cost Optimization J Magalhães-Mendes The 2015 International Conference on Mathematical Methods, Mathematical …, 2015 | 6 | 2015 |
A genetic algorithm for the resource constrained multi-project scheduling problem [J] JJM Mendes, MGC Resende European Journal of Operational Research 189 (3), 1171-1190, 2008 | 6 | 2008 |
MULTIOBJECTIVE OPTIMIZATION OF ROAD CONSTRUCTION PROJECT TIME-COST-QUALITY TRADE-OFF USING GENETIC ALGORITHMS J Magalhães-Mendes Congreso de Métodos Numéricos en Ingeniería 3-5 julio 2017, Valencia, España …, 2017 | 5 | 2017 |