Seguir
Amaia Zuazua-Ros
Amaia Zuazua-Ros
Dirección de correo verificada de unav.es
Título
Citado por
Citado por
Año
Investigation of the thermoelectric potential for heating, cooling and ventilation in buildings: Characterization options and applications
A Zuazua-Ros, C Martín-Gómez, E Ibañez-Puy, M Vidaurre-Arbizu, ...
Renewable Energy 131, 229-239, 2019
682019
From the leather industry to building sector: Exploration of potential applications of discarded solid wastes
M Vidaurre-Arbizu, S Pérez-Bou, A Zuazua-Ros, C Martín-Gómez
Journal of Cleaner Production 291, 125960, 2021
192021
Thermal energy performance in working-spaces from biomorphic models: The tuna case in an office building
A Zuazua-Ros, C Martín-Gómez, J Bermejo-Busto, M Vidaurre-Arbizu, ...
Building Simulation 9, 347-357, 2016
172016
Potential strategies offered by animals to implement in buildings׳ energy performance: Theory and practice
C Martín-Gómez, A Zuazua-Ros, J Bermejo-Busto, E Baquero, R Miranda, ...
Frontiers of Architectural Research 8 (1), 17-31, 2019
162019
Design, assembly and energy performance of a ventilated active thermoelectric envelope module for heating
A Zuazua-Ros, C Martín-Gómez, E Ibáñez-Puy, M Vidaurre-Arbizu, ...
Energy and Buildings 176, 371-379, 2018
162018
Towards cooling systems integration in buildings: Experimental analysis of a heat dissipation panel
A Zuazua-Ros, CM Gómez, JC Ramos, J Bermejo-Busto
Renewable and Sustainable Energy Reviews 72, 73-82, 2017
152017
Bio-inspired heat dissipation system integrated in buildings: development and applications
A Zuazua-Ros, C Martín-Gómez, JC Ramos, T Gómez-Acebo
Energy Procedia 111, 51-60, 2017
132017
Thermal and energy performance assessment of a thermoelectric heat pump integrated in an adiabatic box
E Ibáñez-Puy, C Martín-Gómez, J Bermejo-Busto, A Zuazua-Ros
Applied Energy 228, 681-688, 2018
112018
Integration development of a Ventilated Active Thermoelectric Envelope (VATE): Constructive optimization and thermal performance
C Martín-Gómez, A Zuazua-Ros, KDV de Lersundi, BS Saiz-Ezquerra, ...
Energy and Buildings 231, 110593, 2021
102021
Performance simulation of heat recovery ventilator cores in cascade connection
J Bermejo-Busto, C Martin-Gomez, A Zuazua-Ros, E Baquero, R Miranda
Energy and Buildings 134, 25-36, 2017
102017
Improvement of a peltier hvac system integrated into building envelopes implementing beehive strategies: A theory-based approach
J Bermejo-Busto, C Martin-Gomez, A Zuazua-Ros, M Ibanez-Puy, ...
Dyna 91 (5), 507-511, 2016
102016
Building services cabinets as teaching material in a degree in architecture
C Martín-Gómez, O Zapata, A Zuazua, S Villanueva, P Olaizola
European Journal of Engineering Education 39 (2), 143-156, 2014
92014
Redesign of the integration of building energy from metabolisms of animal: The RIMA project
C MARTÍN-GÓMEZ, J BERMEJO-BUSTO, A ZUAZUA-ROS, R MIRANDA, ...
Proceedings of International Conference CISBAT 2015 Future Buildings and …, 2015
72015
Comparison of detailed occupancy profile generative methods to published standard diversity profiles
D Ioannidis, M Vidaurre-Arbizu, C Martin-Gomez, S Krinidis, I Moschos, ...
Personal and Ubiquitous Computing 21, 521-535, 2017
62017
Performance and feasibility assessment of a hybrid cooling system for office buildings based on heat dissipation panels
A Zuazua-Ros, JC Ramos, C Martín-Gómez, T Gómez-Acebo, E Erell
Energy 205, 117975, 2020
42020
Experimental assessment and model validation of a vertical cooling panel
A Zuazua-Ros, JC Ramos, C Martín-Gómez, T Gómez-Acebo
Energy and Buildings 142, 158-166, 2017
42017
Building Services
C Martín-Gómez, A Zuazua-Ros
Book Publishing, 2012
42012
The conceptualization of exhalation in buildings
S Dorregaray-Oyaregui, A Ariño, LA De Brito, A Zuazua-Ros, JC Ramos, ...
CLIMA 2022 conference, 2022
12022
Characterization and assessment of a hybrid cooling system integrated in building
A Zuazua-Ros
Universidad de Navarra, 2019
12019
Two experimental outcomes from solid waste of leather industry
S Pérez-Bou, A Zuazua-Ros, M Vidaurre-Arbizu, C Martín-Gómez
Barcelona, 2019
12019
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20