Isabel Lopes
Isabel Lopes
Verified email at dps.uminho.pt
Title
Cited by
Cited by
Year
Requirements specification of a computerized maintenance management system–a case study
I Lopes, P Senra, S Vilarinho, V Sá, C Teixeira, J Lopes, A Alves, ...
Procedia Cirp 52, 268-273, 2016
512016
Reconfigurable standardized work in a lean company–a case study
A Pereira, MF Abreu, D Silva, AC Alves, JA Oliveira, I Lopes, ...
Procedia Cirp 52, 239-244, 2016
432016
Preventive maintenance decisions through maintenance optimization models: a case study
S Vilarinho, I Lopes, JA Oliveira
Procedia Manufacturing 11, 1170-1177, 2017
392017
Principles and practices of lean production applied in a metal structures production system
R Carvalho, AC Alves, IS Lopes
International Association of Engineers (IAENG), 2011
322011
Application of data mining in a maintenance system for failure prediction
P Bastos, I Lopes, LCM Pires
Safety, Reliability and Risk Analysis: Beyond the Horizon: 22nd European …, 2014
302014
Prioritizing quality problems in SMEs: a methodology
HN Teixeira, I Lopes, S Sousa
The TQM Journal, 2015
292015
Developing dashboards for SMEs to improve performance of productive equipment and processes
S Vilarinho, I Lopes, S Sousa
Journal of Industrial Information Integration 12, 13-22, 2018
282018
Classification methodology for spare parts management combining maintenance and logistics perspectives
C Teixeira, I Lopes, M Figueiredo
Journal of Management Analytics 5 (2), 116-135, 2018
252018
Quality improvement practices adopted by industrial companies in Portugal
IS Lopes, EP Nunes, S Sousa, D Esteves
International Association of Engineers (IAENG), 2011
232011
A maintenance prediction system using data mining techniques
P Bastos, I Lopes, LCM Pires
World Congress on Engineering 2012 3, 1448-1453, 2012
222012
Using Six Sigma to improve complaints handling
P Abreu, S Sousa, IS Lopes
International Association of Engineers (IAENG), 2012
222012
Six Sigma application for quality improvement of the pin insertion process
JP Costa, IS Lopes, JP Brito
Procedia Manufacturing 38, 1592-1599, 2019
202019
Multi-criteria classification for spare parts management: A case study
C Teixeira, I Lopes, M Figueiredo
Procedia Manufacturing 11, 1560-1567, 2017
202017
A two-day bladder diary for children: Is it enough?
I Lopes, ML Veiga, A Braga, CA Brasil, A Hoffmann, U Barroso Jr
Journal of pediatric urology 11 (6), 348. e1-348. e4, 2015
172015
Measuring and managing operational risk in industrial processes
S Sousa, E Nunes, I Lopes
Fme Transactions 43 (4), 295-302, 2015
172015
Supporting maintenance scheduling: a case study
P Senra, I Lopes, JA Oliveira
Procedia Manufacturing 11, 2123-2130, 2017
142017
Maintenance management practices of companies of the industrial pole of Manaus
AM Oliveira, IS Lopes, D Figueiredo
International Association of Engineers (IAENG), 2014
142014
Design procedure to develop dashboards aimed at improving the performance of productive equipment and processes
S Vilarinho, I Lopes, S Sousa
Procedia Manufacturing 11, 1634-1641, 2017
132017
Maintenance management based on organization maturity level
MM Oliveira, IS Lopes, D Figueiredo
122012
Improvement of scrap request process with Six Sigma methodology
JE Ferreira, IS Lopes
Proceedings of the World Congress on Engineering 3, 2010
122010
The system can't perform the operation now. Try again later.
Articles 1–20