Seguir
Daniel Sánchez Herranz
Daniel Sánchez Herranz
Research Engineer, University of Granada
Dirección de correo verificada de ugr.es
Título
Citado por
Citado por
Año
Preliminary design of the HEBT of IFMIF DONES
O Nomen, D Sanchez-Herranz, C Oliver, I Podadera, R Varela, F Ogando, ...
Fusion Engineering and Design 153, 111515, 2020
212020
The accelerator system of IFMIF-DONES multi-MW facility
I Podadera, A Ibarra, D Jiménez-Rey, J Molla, C de la Morena, C Oliver, ...
Proc. IPAC’21, 1910-1913, 2021
142021
Design of the HEBT components inside TIR room of the IFMIF DONES facility
D Sánchez-Herranz, O Nomen, F Arranz, S Coloma, I Podadera, R Varela
Fusion Engineering and Design 168, 112636, 2021
82021
Beam diagnostics for the multi-MW high energy beam transport line of DONES
I Podadera, A Ibarra, D Jiménez-Rey, J Mollá, C Oliver, R Varela, ...
Proc. 8th Int. Beam Instrumentation Conf.(IBIC’19), 200-204, 2019
82019
Logistics and maintenance research activities for DONES facility
F Arranz, T Lehmann, F Rauscher, G Fischer, S Koehler, J Garrido, ...
Fusion Engineering and Design 192, 113630, 2023
72023
Remote handling in the accelerator systems of DONES
F Arranz, G Micciche, S Coloma, D Sánchez-Herranz, O Nomen, M Ferre, ...
IEEE Transactions on Plasma Science 48 (6), 1743-1747, 2020
72020
Impact of the Magnet Alignment and Field Errors on the Output Uniform Beam at the DONES HEBT line
C Oliver, A Ibarra, J Molla, I Podadera, R Varela, H Dzitko, O Nomen, ...
Proc. IPAC’21, 3251-3253, 2021
62021
Status of the engineering design of the IFMIF-DONES high energy beam transport line and beam dump system
D Sánchez-Herranz, O Nomen, M Sanmartí, BK Singh, F Arranz, ...
Journal of Physics: Conference Series 2420 (1), 012080, 2023
52023
Commissioning plan of the IFMIFDONES accelerator
I Podadera, A Ibarra, M Weber, B Bolzon, N Chauvin, S Chel, A Madur, ...
Proc. LINAC’22, 330-333, 2022
52022
Design and configurations for the Shielding of the Beam Dump of IFMIF DONES
D Sanchez-Herranz, P Ortego, O Nomen, B Branas, F Ogando, P Sauvan, ...
Fusion Engineering and Design 153, 111475, 2020
42020
Overview of IFMIF-DONES diagnostics: Requirements and techniques
C Torregrosa-Martin, A Ibarra, J Aguilar, F Ambi, F Arranz, F Arbeiter, ...
Fusion engineering and design 191, 113556, 2023
32023
Remote handling maintenance of beam dump in IFMIF-DONES
S Coloma, M Ferre, F Arranz, G Miccichè, D Sánchez-Herranz, O Nomen, ...
Fusion Engineering and Design 165, 112216, 2021
22021
Beam-facing material selection for mitigation of residual doses in the HEBT of IFMIF-DONES
F Ogando, L Macia, V Lopez, I Podadera, D Sanchez-Herranz
Nuclear Materials and Energy 38, 101592, 2024
12024
Configuration and Engineering Integration in the IFMIF-DONES Project
D Sánchez-Herranz, J Aguilar, A Moreno, W Krolas
IPAC, 0
1
Engineering design status of IFMIF-DONES High Energy Beam Transport line and Beam Dump system inside the TIR and RIZ
L Macià, O Nomen, M Sanmartí, D Sánchez-Herranz, C Torregrosa-Martin, ...
Fusion Engineering and Design 202, 114312, 2024
2024
Alignment strategy for IFMIF-DONES facility
F Arranz, S Becerril, D Bernardi, T Dezsi, J Gutierrez, M Garcia, J Maestre, ...
Fusion Engineering and Design 200, 114181, 2024
2024
Pee Power Urinal–Microbial Fuel Cell Technology Field Trials In The Context Of Sanitation 2
GP Merino-Jimenez, D Sanchez-Herranz, J Greenman
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–17