Seguir
Youngjong Ko
Youngjong Ko
Pukyong National University
Dirección de correo verificada de pukyong.ac.kr - Página principal
Título
Citado por
Citado por
Año
Fault diagnosis of three-parallel voltage-source converter for a high-power wind turbine
YJ Ko, KB Lee, DC Lee, JM Kim
IET Power Electronics 5 (7), 1058-1067, 2012
962012
Power routing for cascaded H-bridge converters
Y Ko, M Andresen, G Buticchi, M Liserre
IEEE Transactions on Power Electronics 32 (12), 9435-9446, 2017
952017
Thermally compensated discontinuous modulation strategy for cascaded H-bridge converters
Y Ko, M Andresen, G Buticchi, M Liserre
IEEE Transactions on Power Electronics 33 (3), 2704-2713, 2017
602017
Fault diagnosis of a voltage-fed PWM inverter for a three-parallel power conversion system in a wind turbine
YJ Ko, KB Lee
Journal of Power Electronics 10 (6), 686-693, 2010
592010
Power routing: A new paradigm for maintenance scheduling
M Liserre, G Buticchi, JI Leon, AM Alcaide, V Raveendran, Y Ko, ...
IEEE Industrial Electronics Magazine 14 (3), 33-45, 2020
552020
Discontinuous-modulation-based active thermal control of power electronic modules in wind farms
Y Ko, M Andresen, G Buticchi, M Liserre
IEEE Transactions on Power Electronics 34 (1), 301-310, 2018
502018
Performance comparison of variable-angle phase-shifting carrier PWM techniques
VG Monopoli, Y Ko, G Buticchi, M Liserre
IEEE Transactions on Industrial Electronics 65 (7), 5272-5281, 2017
352017
Improved harmonic performance of cascaded H-bridge converters with thermal control
VG Monopoli, A Marquez, JI Leon, Y Ko, G Buticchi, M Liserre
IEEE Transactions on Industrial Electronics 66 (7), 4982-4991, 2018
322018
An improved phase-shifted PWM method for a three-phase cascaded H-bridge multi-level inverter
JS Lee, KB Lee, Y Ko
2017 IEEE Energy Conversion Congress and Exposition (ECCE), 2100-2105, 2017
272017
Sampling-time harmonic control for cascaded H-bridge converters with thermal control
A Marquez, VG Monopoli, JI Leon, Y Ko, G Buticchi, S Vazquez, M Liserre, ...
IEEE Transactions on Industrial Electronics 67 (4), 2776-2785, 2019
262019
Analysis of DC-link current influence on temperature variation of capacitor in a wind turbine application
Y jong Ko, H Jedtberg, G Buticchi, M Liserre
IEEE Transactions on Power Electronics 33 (4), 3441-3451, 2017
222017
Thermally compensated discontinuous modulation for MVAC/LVDC building blocks of modular smart transformers
Y Ko, V Raveendran, M Andresen, M Liserre
IEEE Transactions on Power Electronics 35 (1), 220-231, 2019
212019
Modulation for cascaded multilevel converters in PV applications with high input power imbalance
Y Ko, M Andresen, K Wang, M Liserre
IEEE Transactions on Power Electronics 36 (9), 10866-10878, 2021
192021
Advanced discontinuous modulation for thermally compensated modular smart transformers
Y Ko, V Raveendran, M Andresen, M Liserre
IEEE Transactions on Power Electronics 35 (3), 2445-2457, 2019
192019
Smart transformer universal operation
Y Ko, A Chub, L Costa, M Andresen, M Liserre
2018 IEEE applied power electronics conference and exposition (APEC), 1609-1616, 2018
182018
Modulation strategy for highly reliable cascade H-Bridge inverter based on discontinuous PWM
Y Ko, M Andresen, G Buticchi, JS Lee, M Liserre
2017 IEEE Applied Power Electronics Conference and Exposition (APEC), 3241-3246, 2017
172017
A new PLL system using full order observer and PLL system modeling in a single phase grid-connected inverter
Y Ko, K Park, KB Lee, F Blaabjerg
8th International Conference on Power Electronics-ECCE Asia, 803-808, 2011
162011
Modulation strategies for thermal stress control of CHB inverters
Y Ko, J Kuprat, S Pugliese, M Liserre
IEEE Transactions on Power Electronics 37 (3), 3515-3527, 2021
112021
A smart transformer-rectifier unit for the more electric aircraft
G Buticchi, C Gerada, YJ Ko, M Liserre
2018 IEEE 27th International Symposium on Industrial Electronics (ISIE), 324-328, 2018
112018
Multi-frequency power routing for cascaded H-bridge inverters in smart transformer application
Y Ko, M Andresen, G Buticchi, M Liserre, L Concari
2016 IEEE Energy Conversion Congress and Exposition (ECCE), 1-7, 2016
102016
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20