Follow
David Alcaide-López-de-Pablo
Title
Cited by
Cited by
Year
Complexity of cyclic scheduling problems: A state-of-the-art survey
E Levner, V Kats, D Alcaide-López-de-Pablo, TCE Cheng
Computers & Industrial Engineering 59 (2), 352-361, 2010
2272010
An inventory model for deteriorating items with shortages and time-varying demand
J Sicilia, M González-De-la-Rosa, J Febles-Acosta, ...
International Journal of Production Economics 155, 155-162, 2014
962014
An inventory system with demand dependent on both time and price assuming backlogged shortages
LA San-José, J Sicilia, D Alcaide-López-de-Pablo
European Journal of Operational Research 270 (3), 889-897, 2018
662018
A tabu search algorithm for the open shop problem
D Alcaide, J Sicilia, D Vigo
Top. ISSN: 1134-5764. 5 (2), 283-296, 1997
61*1997
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
D Alcaide, C Chu, V Kats, E Levner, G Sierksma
European Journal of Operational Research 177 (1), 147-162, 2007
472007
Analysis of the efficiency of farming systems in Latin America and the Caribbean considering environmental issues.
R Dios-Palomares, D Alcaide, J Diz, M Jurado, A Prieto, M Morantes, ...
Revista Científica 25 (1), 43-50, 2015
43*2015
An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
D Alcaide, A Rodriguez-Gonzalez, J Sicilia
European Journal of Operational Research 140 (2), 384-398, 2002
422002
Network flow approaches to pre-emptive open-shop scheduling problems with time-windows
A Sedeño-Noda, D Alcaide, C González-Martín
European Journal of Operational Research 174 (3), 1501-1518, 2006
382006
Maximization of the return on inventory management expense in a system with price-and stock-dependent demand rate
V Pando, LA San-Jose, J Sicilia, D Alcaide-Lopez-de-Pablo
Computers & Operations Research 127, 105134, 2021
372021
A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures
D Alcaide, A Rodriguez-Gonzalez, J Sicilia
International Journal of Flexible Manufacturing Systems 17, 201-226, 2005
342005
Wastewater reuse-risk assessment, decision-making and environmental security
MK Zaidi
Springer Science & Business Media, 2007
332007
Optimal policy for an inventory system with power demand, backlogged shortages and production rate proportional to demand rate
J Sicilia, M González-De-la-Rosa, J Febles-Acosta, ...
International Journal of Production Economics 155, 163-171, 2014
292014
Cyclic scheduling in robotic cells: an extension of basic models in machine scheduling theory
E Levner, V Kats, D Alcaide-López-de-Pablo
Multiprocessor scheduling, theory and applications, 2007
282007
A network flow-based method to solve performance cost and makespan open-shop scheduling problems with time-windows
A Sedeño-Noda, D Alcaide-López-de-Pablo, C González-Martín
European Journal of Operational Research 196 (1), 140-154, 2009
242009
Optimal inventory policies for uniform replenishment systems with time-dependent demand
J Sicilia, M González-De-la-Rosa, J Febles-Acosta, ...
International Journal of Production Research 53 (12), 3603-3622, 2015
212015
Optimal policy for multi-item systems with stochastic demands, backlogged shortages and limited storage capacity
J Sicilia, LA San-Jose, D Alcaide-Lopez-de-Pablo, B Abdul-Jalbar
Applied Mathematical Modelling 108, 236-257, 2022
20*2022
An inventory system with time-dependent demand and partial backordering under return on inventory investment maximization
LA San-José, J Sicilia, V Pando, D Alcaide-López-de-Pablo
Computers & Operations Research 145, 105861, 2022
172022
A new multicriteria approach for the analysis of efficiency in the Spanish olive oil sector by modelling decision maker preferences
D Alcaide-López-de-Pablo, R Dios-Palomares, ÁM Prieto
European Journal of Operational Research 234 (1), 241-252, 2014
172014
Fuzzifying clustering algorithms: The case study of MajorClust
E Levner, D Pinto, P Rosso, D Alcaide, RRK Sharma
Mexican International Conference on Artificial Intelligence, 821-830, 2007
122007
Optimization of an inventory system with partial backlogging from a financial investment perspective
LA San‐José, J Sicilia, V Pando, D Alcaide‐López‐de‐Pablo
International Transactions in Operational Research 29 (2), 706-728, 2022
112022
The system can't perform the operation now. Try again later.
Articles 1–20