Segueix
Ashkan Ayough
Títol
Citada per
Citada per
Any
GA and ICA approaches to job rotation scheduling problem: considering employee’s boredom
A Ayough, M Zandieh, H Farsijani
The International Journal of Advanced Manufacturing Technology 60, 651-666, 2012
582012
Value stream mapping approach and analytical network process to identify and prioritize production system’s Mudas (case study: natural fibre clothing manufacturing company)
D Behnam, A Ayough, SH Mirghaderi
The Journal of The Textile Institute 109 (1), 64-72, 2018
512018
Balancing, Sequencing, and Job Rotation Scheduling of a U-Shaped Lean Cell with Dynamic Operator Performance
A Ayough, M Zandieh, F Farhadi
Computers & Industrial Engineering, 2020
372020
Turnaround project risk assessment using hybrid fuzzy SWARA and EDAS method: case of upstream oil process industries in Iran
MR Moniri, AA Tabriz, A Ayough, M Zandieh
Journal of Engineering, Design and Technology 19 (4), 966-988, 2021
182021
Job rotation scheduling in the Seru system: shake enforced invasive weed optimization approach
A Ayough, M Hosseinzadeh, A Motameni
Assembly Automation, 2020
182020
Designing a manufacturing cell system by assigning workforce
A Ayough, B Khorshidvand
Journal of Industrial Engineering and Management 12 (1), 13-26, 2019
172019
A new interactive method based on multi-criteria preference degree functions for solar power plant site selection
A Ayough, S Boshruei, B Khorshidvand
Renewable Energy, 2022
142022
Job Rotation Scheduling in a Newly Arranged Lean Cell, a Genetic Algorithm Approach
A Ayough, M Zandieh, H Farsijani, B Dorri Nokarani
Journal of Industrial Management Perspective 4 (3, Autumn 2014), 33-59, 2014
142014
An integrated approach for three-dimensional capacitated vehicle routing problem considering time windows
A Ayough, B Khorshidvand, N Massomnedjad, A Motameni
Journal of Modelling in Management,, 2020
132020
A new integrated approach based on base-criterion and utility additive methods and its application to supplier selection problem
A Ayough, SB Shargh, B Khorshidvand
Expert Systems with Applications 221, 119740, 2023
122023
Modelling age based replacement decisions considering shocks and failure rate
AA Tabriz, B Khorshidvand, A Ayough
International Journal of Quality & Reliability Management 33 (1), 107-119, 2015
122015
How to Make Lean Cellular Manufacturing Work? Integrating Human Factors in the Design and Improvement Process
A Ayough, F Farhadi
IEEE Engineering Management Review, 2019
72019
A simulated annealing approach to optimize multi-products EPQ model with discrete delivery orders, imperfect production processes and service level constraint
H Farsijani, MS Nikabadi, A Ayough
World Applied Sciences Journal 16 (8), 1142-1157, 2012
62012
The job rotation scheduling problem considering human cognitive effects: an integrated approach
A Ayough, F Farhadi, M Zandieh
Assembly Automation 41 (2), 221-236, 2021
52021
Investigating the impact of technological distinctive competencies and information technology capabilities on internet entrepreneurship by means of innovation capability
A Ayough
AMC Indian Journal of Entrepreneurship, 2020
52020
An Integrated Model for Analysis and Improvement of Scheduling “Flexible Manufacturing Systems (FMS)” and Dispatching “Automated Guided Vehicle (AGV)” Problems
SM Sajadi, A Ayough, MM Sayed Isfahani
Journal of Industrial Management Perspective 6 (1, Spring 2016), 97-127, 2016
52016
Upstream Oil Process Plants Turnaround Projects Risk Evaluation Using a Hybrid Fuzzy MADM Method
M Moniri, A Alem-Tabriz, A Ayough
The Journal of Industrial Management Perspective 12, 135-173, 2022
42022
Making distribution operations lean: the management system approach in a case
A Ayough, R Rafiei, A Shabbak
Journal of Engineering, Design and Technology 20 (5), 1188-1216, 2022
32022
Genetic algorithm for obstacle location-allocation problems with customer priorities
A Ayough, F Farhadi, M Zandieh, P Rastkhadiv
Journal of Industrial Management and Optimization 17 (4), 1753-1769, 2021
32021
Adaptive aggregate production planning with fuzzy goal programming approach
A Ayough
Journal of Industrial Engineering and Management Studies (JIEMS) 5 (2), Page …, 2018
32018
En aquests moments el sistema no pot dur a terme l'operació. Torneu-ho a provar més tard.
Articles 1–20